Solar PV Operational

Mandrup III Solar PV Plant - 4 MW Facility in India

India
Visit official website

Overview

Mandrup III is a 4 MW solar PV facility located in India. It is operational and contributes to the country's renewable energy capacity.

Mandrup III is a solar photovoltaic (PV) power plant located in India, with a capacity of 4 megawatts (MW). The facility is operational and adds to India's growing renewable energy portfolio, supporting the country's ambitious targets under the National Solar Mission. The plant uses solar PV technology to convert sunlight into electricity. The 4 MW scale classifies it as a small-to-medium solar installation. India's renewable energy sector benefits from national policies like the Jawaharlal Nehru National Solar Mission and state-level renewable purchase obligations, which drive solar deployment. Solar PV plants like Mandrup III play a key role in reducing greenhouse gas emissions and diversifying India's energy mix. The facility's location in Maharashtra contributes to local grid stability and supports rural electrification efforts. Its operation aligns with India's goal of achieving 500 GW of non-fossil fuel capacity by 2030.

Environmental context

Solar PV installations like Mandrup III have a low environmental footprint during operation, with no emissions or water consumption. However, land use for solar farms can impact local ecosystems and agriculture. In India, solar projects are often sited on barren or underutilized land to minimize conflicts. The facility's location in a semi-arid region of Maharashtra reduces pressure on arable land, while the dry climate favors solar energy generation.

Frequently asked questions

Mandrup III is a solar PV plant located in India, with coordinates approximately 17.5008° N, 75.7876° E, in the state of Maharashtra.

Mandrup III has a capacity of 4 megawatts (MW), making it a small-to-medium scale solar photovoltaic facility.

Mandrup III uses solar photovoltaic (PV) technology to generate electricity from sunlight.

India's solar energy sector is supported by the Jawaharlal Nehru National Solar Mission, which targets 100 GW of solar capacity by 2022, and state-level renewable purchase obligations (RPOs) that require utilities to source a percentage of power from renewables.

Mandrup III adds 4 MW of clean energy to the grid, helping India reduce reliance on fossil fuels and meet its target of 500 GW of non-fossil fuel capacity by 2030.
UtilityRadar
More
Press Esc to close · Browse by sector