Solar PV Operational

Nirmal Mahindra Solar PV Plant, India - 50 MW Renewable Energy Facility

India
Visit official website

Overview

Nirmal Mahindra is a 50 MW solar PV facility located in India. The plant is operational and contributes to the country's renewable energy capacity.

Nirmal Mahindra is a solar photovoltaic (PV) power plant located in India, with a capacity of 50 megawatts (MW). The facility is operational and plays a role in India's growing renewable energy sector, which is supported by national targets and policies such as the Jawaharlal Nehru National Solar Mission. The plant uses solar PV technology to convert sunlight into electricity. With a capacity of 50 MW, it falls into the medium-to-large scale category for solar farms in India. The facility benefits from India's regulatory framework, including renewable purchase obligations (RPOs) and competitive bidding mechanisms that have driven down solar tariffs. Operationally, Nirmal Mahindra contributes to grid stability and helps reduce carbon emissions by displacing fossil fuel-based generation. The plant supports India's goal of achieving 500 GW of non-fossil fuel capacity by 2030, aligning with national climate commitments under the Paris Agreement.

Environmental context

The plant is located in a region with high solar irradiance, typical of many parts of India, making it suitable for solar PV generation. The facility's land use involves converting open or agricultural land to energy production, which can have visual and ecological impacts. However, solar PV generally has lower environmental impact compared to fossil fuels, with no emissions during operation. The plant's location away from sensitive habitats minimizes risks to local biodiversity.

Frequently asked questions

Nirmal Mahindra is located in India, with coordinates approximately 19.048° N, 78.288° E.

The Nirmal Mahindra solar PV plant has a capacity of 50 megawatts (MW).

Yes, the Nirmal Mahindra solar plant is operational.

India's solar energy sector is supported by the Jawaharlal Nehru National Solar Mission, renewable purchase obligations (RPOs), and competitive bidding for tariffs. The government aims for 500 GW of non-fossil fuel capacity by 2030.

Nirmal Mahindra uses solar photovoltaic (PV) technology to generate electricity from sunlight.
UtilityRadar
More
Press Esc to close · Browse by sector