Overview
Tikar SJG is a 5.1 MW solar PV plant located in India. It contributes to the country's renewable energy capacity under the national solar mission.
Tikar SJG is a solar photovoltaic (PV) power plant located in India, with a capacity of 5.1 MW. The facility is operational and adds to India's growing solar energy portfolio, supporting the nation's ambitious renewable energy targets. The plant operates under India's regulatory framework, which includes national solar missions and state-level renewable purchase obligations. Solar PV technology converts sunlight directly into electricity, and at this scale, the plant is considered small to medium, typical for distributed solar projects in India. Environmentally, the plant contributes to reducing greenhouse gas emissions by displacing fossil fuel-based electricity. It also supports local energy security and grid stability, particularly in regions with high solar insolation like Gujarat, where the plant is located.
Environmental context
The plant is located in Gujarat, a state with high solar irradiance, making it ideal for solar PV generation. The region's arid climate minimizes cloud cover, ensuring consistent energy output. Solar farms like Tikar SJG help reduce land degradation by providing a non-extractive use of land, though they require significant land area. The facility avoids air and water pollution associated with fossil fuels, contributing to local environmental quality.
Frequently asked questions
Tikar SJG is a solar PV plant located in India, with coordinates 22.707000 N, 71.413000 E, likely in the state of Gujarat.
Tikar SJG has a capacity of 5.1 MW, making it a small to medium-scale solar photovoltaic facility.
Tikar SJG uses solar photovoltaic (PV) technology to convert sunlight into electricity.
India's solar energy sector is supported by the National Solar Mission, state-level renewable purchase obligations (RPOs), and various incentives like accelerated depreciation and viability gap funding.
Tikar SJG adds 5.1 MW of solar capacity, helping India achieve its target of 500 GW of non-fossil fuel capacity by 2030.