Gunma Farmdo is a 13 MW solar PV facility located in Gunma Prefecture, Japan. The plant is operational and contributes to Japan's renewable energy capacity under the country's feed-in tariff program.

Gunma Farmdo is a solar photovoltaic (PV) power plant located in Gunma Prefecture, Japan. With a capacity of 13 MW, it falls into the medium-scale category for solar installations in Japan. The facility is operational and plays a role in the region's renewable energy generation. The plant operates under Japan's feed-in tariff (FIT) scheme, which has been instrumental in driving solar PV deployment since its introduction in 2012. The FIT provides guaranteed payments for renewable electricity, supporting projects like Gunma Farmdo. Japan's renewable energy targets aim for 36-38% of electricity from renewables by 2030, with solar PV being a key component. Gunma Farmdo contributes to local clean energy supply and helps reduce greenhouse gas emissions. The facility is part of Japan's broader effort to diversify its energy mix following the Fukushima nuclear incident. Solar PV installations in Gunma benefit from the region's solar resource, supporting grid stability and energy independence.

Environmental context

Gunma Prefecture is located in the Kanto region of Honshu, Japan, characterized by mountainous terrain and a temperate climate. Solar PV installations like Gunma Farmdo utilize land that may have been previously agricultural or undeveloped, potentially impacting local land use. The facility's operation avoids air emissions and water consumption associated with fossil fuel plants, contributing to local air quality and water conservation. However, solar farms can affect local ecosystems through land cover change, though careful siting can minimize these impacts.

Frequently asked questions

Gunma Farmdo is located in Gunma Prefecture, Japan, at coordinates 36.3831 N, 138.9664 E.

Gunma Farmdo has a capacity of 13 megawatts (MW), making it a medium-scale solar photovoltaic facility.

Gunma Farmdo generates electricity from solar photovoltaic (PV) panels, converting sunlight directly into power.

Japan supports solar PV through a feed-in tariff (FIT) program, which guarantees fixed payments for renewable electricity over a set period, encouraging investment in solar energy.

Solar farms in Japan can affect land use and local ecosystems, but they produce no air emissions or water pollution during operation, helping reduce greenhouse gas emissions and fossil fuel dependence.