Overview
Rokkasho - Chitosedaira North Solar Power Plant is a 50 MW solar PV facility in Rokkasho, Japan. Operated by Eurus Rokkasho Solar Park, it contributes to Japan's renewable energy expansion under the Feed-in Tariff scheme.
Rokkasho - Chitosedaira North Solar Power Plant is a utility-scale solar photovoltaic facility located in Rokkasho, Aomori Prefecture, Japan. With a capacity of 50 megawatts, it is a medium-to-large solar installation within Japan's growing renewable energy portfolio. The plant is owned and operated by Eurus Rokkasho Solar Park and has been operational, supplying clean electricity to the grid. The plant operates under Japan's Feed-in Tariff (FiT) program, which has driven significant solar capacity additions since its introduction in 2012. Japan's renewable energy targets aim for 36-38% renewables by 2030, with solar playing a key role. The facility's 50 MW capacity places it among the larger solar farms in the region, benefiting from Japan's high solar irradiance in northern Honshu. Environmentally, the plant supports Japan's transition away from fossil fuels and nuclear power post-Fukushima. Solar PV has minimal water usage and low operational emissions. The facility's location in Rokkasho, a rural area with ample land, reduces land-use conflicts. Grid integration of variable solar power is managed through Japan's grid interconnection standards and regional balancing.
Environmental context
The Rokkasho area in Aomori Prefecture features a mix of agricultural land and coastal plains, with moderate solar irradiance suitable for PV generation. Large-scale solar farms like this one require significant land area, which can impact local ecosystems and land use. However, solar PV has low water consumption and no air emissions during operation. Japan's strict environmental impact assessments help mitigate habitat disruption, and the facility's location away from densely populated areas reduces visual and noise concerns.
Frequently asked questions
The plant is located in Rokkasho, Aomori Prefecture, Japan, at coordinates 40.8964 N, 141.2815 E.
The facility has a capacity of 50 megawatts (MW), making it a medium-to-large solar PV installation in Japan.
The plant is owned and operated by Eurus Rokkasho Solar Park.
Japan's Feed-in Tariff (FiT) program, introduced in 2012, guarantees fixed payments for solar electricity, driving rapid capacity growth. The country targets 36-38% renewables by 2030.
Solar PV has low operational emissions and water use, but large installations require land, potentially affecting local habitats. Japan mandates environmental impact assessments to minimize disruption.