Overview
Tenri II is a 10.5 MW operational solar PV facility located in Japan. It contributes to the country's renewable energy capacity under the national feed-in tariff scheme.
Tenri II is an operational solar photovoltaic (PV) power plant located in Japan, with a capacity of 10.5 megawatts (MW). This scale places it in the small-to-medium range for solar PV facilities in the country, which has seen rapid growth in solar deployment since the introduction of feed-in tariffs in 2012. The facility operates under Japan's renewable energy regulatory framework, which includes a feed-in tariff (FIT) program that has driven significant solar capacity additions. Solar PV is the dominant renewable technology in Japan, supported by government targets to increase renewable energy share and reduce reliance on fossil fuels. The plant's location in the Nara Prefecture region benefits from adequate solar irradiation for efficient power generation. Tenri II contributes to Japan's energy mix by supplying clean electricity to the grid, helping to reduce greenhouse gas emissions. As part of the broader solar PV fleet, it supports the country's goal of achieving carbon neutrality by 2050. The facility's operational status ensures ongoing generation without the intermittency challenges associated with smaller or unmanaged systems.
Environmental context
Solar PV installations like Tenri II have a low environmental footprint during operation, with no emissions or water consumption. However, land use for solar farms can impact local ecosystems and agriculture. In Japan, where land is scarce, ground-mounted solar projects often compete with other uses. The facility's location in a temperate region with seasonal cloud cover may affect generation efficiency, but overall solar power contributes positively to reducing air pollution and fossil fuel dependence.
Frequently asked questions
Tenri II is a solar PV power plant located in Japan, with coordinates approximately 34.5990° N, 135.9150° E, in the Nara Prefecture region.
Tenri II has a capacity of 10.5 megawatts (MW), making it a small-to-medium scale solar PV facility.
Tenri II is a solar photovoltaic (PV) plant, which converts sunlight directly into electricity using semiconductor panels.
Japan supports solar energy through a feed-in tariff (FIT) program introduced in 2012, which guarantees fixed payments for renewable electricity generation, driving significant solar deployment.
Solar PV plants have low operational emissions but require land area, which can affect local habitats. In Japan, ground-mounted solar farms are often built on unused or agricultural land, balancing energy needs with environmental considerations.