Risk: Low Solar PV Operational

Quweira Solar PV Plant | 103 MW Renewable Energy Facility in Jordan

Jordan
Visit official website

Overview

Quweira is a 103 MW solar PV plant in Jordan, operational and contributing to the country's renewable energy targets under the national energy strategy.

Quweira is a solar photovoltaic (PV) power plant located in Jordan, with a capacity of 103 megawatts (MW). The facility is operational and plays a significant role in Jordan's renewable energy landscape, which aims to increase the share of renewables in the energy mix. As a large-scale solar installation, Quweira aligns with the country's goal to generate 31% of its electricity from renewables by 2030. The plant utilizes solar PV technology to convert sunlight into electricity, with a capacity that places it among the larger solar farms in the region. Jordan benefits from high solar irradiance, making solar PV a particularly effective technology. The facility operates under Jordan's regulatory framework, which includes feed-in tariffs and net metering schemes to encourage renewable energy development. The country has also implemented a national renewable energy action plan to attract investment and reduce dependence on imported fossil fuels. Environmentally, Quweira contributes to reducing greenhouse gas emissions by displacing fossil fuel-based generation. Solar PV plants like Quweira have minimal water consumption and low operational emissions, though they require significant land area. The plant supports grid stability and helps Jordan meet its climate commitments under the Paris Agreement. Its location in a sunny region maximizes energy production, supporting local energy security and economic development.

Environmental context

Jordan's arid climate and high solar irradiance make solar PV a highly suitable renewable energy technology. Large-scale solar installations like Quweira require substantial land area, which can impact local desert ecosystems and land use. However, solar PV has low water consumption and no direct emissions during operation, offering significant environmental benefits over fossil fuel plants. The facility supports Jordan's goals to reduce carbon emissions and diversify its energy mix, contributing to regional air quality improvements and climate change mitigation.

Frequently asked questions

The Quweira solar PV plant is located in Jordan, near the town of Quweira in the southern part of the country, with coordinates approximately 29.73° N, 35.35° E.

The Quweira solar plant has a capacity of 103 megawatts (MW), making it a large-scale solar photovoltaic facility.

The Quweira plant uses solar photovoltaic (PV) technology to convert sunlight directly into electricity.

Jordan supports renewable energy through its National Renewable Energy Action Plan, feed-in tariffs, and net metering schemes, aiming for 31% renewable electricity by 2030.

Quweira helps Jordan increase its renewable energy share, reduce reliance on imported fossil fuels, and lower greenhouse gas emissions, aligning with national climate commitments.
UtilityRadar