Solar PV Operational

Acil 1 Solar PV Plant, Portugal | 2 MW Operational Facility

Portugal
Visit official website

Overview

Acil 1 is a 2 MW operational solar PV facility located in Portugal. It contributes to the country's renewable energy capacity under the EU Renewable Energy Directive.

Acil 1 is a solar photovoltaic (PV) power plant located in Portugal, with an operational status and a capacity of 2 MW. This facility is part of Portugal's growing solar energy sector, which benefits from the country's high solar irradiation levels. As a small-scale solar installation, Acil 1 supports local energy generation and grid stability. The plant operates under Portugal's national renewable energy framework, which aligns with the EU Renewable Energy Directive III (2023/2413), targeting 42.5% renewable energy by 2030. Portugal has implemented feed-in tariffs and grid connection policies to encourage solar PV deployment. The 2 MW capacity places Acil 1 in the small-scale category, typical for distributed generation projects. Environmentally, Acil 1 contributes to reducing greenhouse gas emissions and reliance on fossil fuels. Solar PV installations have minimal operational emissions, though land use and visual impact are considerations. The facility supports Portugal's goal of carbon neutrality by 2050 and enhances energy independence.

Environmental context

Portugal's solar PV sector benefits from high solar irradiation, especially in southern regions. Acil 1's location in a temperate climate zone allows for consistent energy generation. Solar farms can impact land use and local ecosystems, but proper siting minimizes disruption. The facility supports Portugal's renewable energy targets and reduces carbon emissions.

Frequently asked questions

Acil 1 is located in Portugal, with coordinates approximately 38.7086° N, -8.6250° W.

Acil 1 has a capacity of 2 megawatts (MW), making it a small-scale solar photovoltaic facility.

Acil 1 generates solar energy using photovoltaic panels, converting sunlight into electricity.

Portugal aims to achieve 42.5% renewable energy by 2030 under the EU Renewable Energy Directive. Acil 1 contributes to this target by adding solar capacity.

Portugal's solar PV sector is supported by national feed-in tariffs and grid connection policies, aligned with the EU Renewable Energy Directive III (2023/2413).
UtilityRadar
More
Press Esc to close · Browse by sector