Overview
Martim Longo 1 is a 1.1 MW operational solar PV facility in Portugal. It contributes to the country's renewable energy capacity under the EU Renewable Energy Directive.
Martim Longo 1 is a solar photovoltaic (PV) power plant located in Portugal, with an installed capacity of 1.102 MW. The facility is operational and contributes to Portugal's growing renewable energy portfolio. As a small-scale solar installation, it supports local energy generation and aligns with national goals for decarbonization. The plant operates under Portugal's regulatory framework, which is aligned with the EU Renewable Energy Directive III (2023/2413), targeting 42.5% renewable energy by 2030. Portugal has implemented feed-in tariffs and grid connection regimes to support solar PV development. The facility's capacity of 1.1 MW places it in the small-scale category, typical for distributed solar projects in the region. Solar PV plants like Martim Longo 1 play a key role in reducing greenhouse gas emissions and diversifying energy sources. They have minimal operational environmental impact, though land use and visual effects are considerations. The facility supports Portugal's energy transition and contributes to grid stability through distributed generation.
Environmental context
Portugal's solar PV sector benefits from high solar irradiance, particularly in the southern regions. Solar farms require land for panel installation, which can affect local habitats and land use. However, they produce no emissions during operation and have a low water footprint. The environmental context includes integration with agricultural land (agrivoltaics) and biodiversity considerations, though specific impacts depend on site management.
Frequently asked questions
Martim Longo 1 is a solar PV plant located in Portugal, with coordinates approximately 37.44°N, -7.75°W.
Martim Longo 1 has an installed capacity of 1.102 MW, making it a small-scale solar photovoltaic facility.
Yes, Martim Longo 1 is currently operational and generating electricity from solar energy.
Portugal follows the EU Renewable Energy Directive III, which sets a 42.5% renewable energy target by 2030. The country also uses feed-in tariffs and grid connection policies to support solar PV development.
As a solar PV plant, Martim Longo 1 generates clean electricity, reducing reliance on fossil fuels and helping Portugal meet its national and EU renewable energy targets.