Overview
Second Energy is an operational solar PV facility located in Saudi Arabia. The plant contributes to the country's renewable energy capacity under the Saudi Vision 2030 framework.
Second Energy is a solar photovoltaic (PV) power plant located in Saudi Arabia, operating in the solar energy sector. The facility is situated at coordinates 26.300360°N, 50.181514°E, and is classified as a solar energy company. As an operational plant, it plays a role in the country's growing renewable energy portfolio. The plant utilizes solar PV technology to convert sunlight into electricity. Solar PV plants in Saudi Arabia typically range from small-scale (under 10 MW) to utility-scale (over 100 MW). The facility operates under Saudi Arabia's regulatory framework, which includes the National Renewable Energy Program (NREP) and targets under Vision 2030 to diversify energy sources and reduce reliance on fossil fuels. Second Energy contributes to the local grid by supplying clean electricity, supporting Saudi Arabia's goal of generating 50% of its energy from renewables by 2030. The plant's location in the Eastern Province benefits from high solar irradiance, making it well-suited for solar energy generation. Its operations align with national efforts to reduce carbon emissions and promote sustainable energy development.
Environmental context
Saudi Arabia's Eastern Province, where Second Energy is located, features arid desert climate with high solar irradiance, ideal for solar PV generation. The region's flat terrain and low vegetation minimize land-use conflicts, though large-scale solar farms can impact local wildlife habitats. Solar energy helps reduce greenhouse gas emissions and water consumption compared to fossil fuel plants, supporting national climate goals under the Paris Agreement.
Frequently asked questions
Second Energy is located in Saudi Arabia, specifically in the Eastern Province near the city of Dammam, at coordinates 26.300360°N, 50.181514°E.
Second Energy is a solar photovoltaic (PV) plant that generates electricity by converting sunlight directly into power using solar panels.
The specific capacity of Second Energy has not been disclosed. Solar PV plants in Saudi Arabia typically range from small-scale installations to large utility-scale projects exceeding 100 MW.
Solar energy in Saudi Arabia is governed by the National Renewable Energy Program (NREP) under Vision 2030, which aims to generate 50% of the country's electricity from renewables by 2030. The program includes competitive auctions and feed-in tariffs to promote solar PV development.
Second Energy supports Saudi Arabia's Vision 2030 by adding solar capacity to the national grid, reducing reliance on fossil fuels, and helping achieve the target of 58.7 GW of renewable energy capacity by 2030.