Solar PV Operational

Pozohondo I Solar PV Plant | 4 MW Operational Facility in Spain

Spain
Visit official website

Overview

Pozohondo I is a 4 MW operational solar PV facility in Spain, contributing to the country's renewable energy capacity under the EU Renewable Energy Directive III framework.

Pozohondo I is a solar photovoltaic (PV) power plant located in Spain, with an installed capacity of 4 megawatts. The facility is operational and contributes to Spain's growing renewable energy portfolio, which is supported by national feed-in tariffs and grid-connection regimes aligned with EU targets. The plant uses solar PV technology to convert sunlight into electricity, a mature and widely deployed renewable energy source. Spain's solar resource is among the best in Europe, making solar PV a key component of the country's energy transition. The 4 MW scale places Pozohondo I in the small-to-medium category for utility-scale solar installations. Operationally, Pozohondo I feeds clean electricity into the Spanish grid, helping to reduce reliance on fossil fuels and lower carbon emissions. Its location in the Castilla-La Mancha region benefits from high solar irradiance, supporting efficient energy generation. The facility aligns with Spain's National Energy and Climate Plan (NECP) targets for 2030.

Environmental context

Solar PV installations like Pozohondo I have a low environmental footprint during operation, with no emissions or water consumption. However, land use for solar farms can impact local ecosystems and agricultural land. In Spain, solar projects are typically sited in areas with high solar irradiance, often on marginal or non-arable land to minimize conflicts. The facility's small scale reduces visual and land-use impacts compared to larger installations.

Frequently asked questions

Pozohondo I is a solar PV power plant located in Spain, with coordinates approximately 38.7167° N, -1.8857° W.

Pozohondo I has an installed capacity of 4 megawatts (MW), making it a small-to-medium scale solar PV facility.

Pozohondo I uses solar photovoltaic (PV) technology to generate electricity from sunlight.

Spain aims to achieve 74% renewable electricity by 2030 under its National Energy and Climate Plan. Facilities like Pozohondo I contribute to this target by adding solar capacity.

Solar PV in Spain operates under the EU Renewable Energy Directive III, which sets a 42.5% renewable energy target by 2030, and national feed-in tariffs and grid access regulations.