Solar PV Operational

PUERTO ERRADO 2 Solar PV Plant | Spain Renewable Energy Facility

Spain
Visit official website

Overview

PUERTO ERRADO 2 is a 30 MW solar PV plant in Spain, owned by TUBO SOL PE2 S.L. It contributes to Spain's renewable energy capacity under EU Renewable Energy Directive targets.

PUERTO ERRADO 2 is a solar photovoltaic (PV) power plant located in Spain, with a capacity of 30 megawatts (MW). The facility is owned by TUBO SOL PE2 S.L. and is currently operational, adding to Spain's growing portfolio of solar energy assets. The plant operates within Spain's supportive regulatory framework for renewable energy, which aligns with the European Union's Renewable Energy Directive III (2023/2413), targeting a 42.5% renewable share by 2030. Spain has implemented national feed-in tariffs and grid connection regimes to incentivize solar PV development, making it a favorable market for medium-scale solar projects like PUERTO ERRADO 2. As a solar PV facility, PUERTO ERRADO 2 generates clean electricity without direct emissions, supporting Spain's decarbonization goals. The plant's location in the sunny Murcia region benefits from high solar irradiance, optimizing energy production. Its grid-connected role helps displace fossil fuel generation and contributes to local energy security.

Environmental context

Solar PV plants like PUERTO ERRADO 2 have a low environmental footprint during operation, with no air or water emissions. However, land use for solar arrays can impact local ecosystems and visual landscapes. In Spain's arid regions, careful siting is needed to avoid sensitive habitats. The plant's 30 MW scale represents a moderate land footprint, typical for ground-mounted solar farms.

Frequently asked questions

PUERTO ERRADO 2 is a solar PV plant located in Spain, specifically in the Murcia region near the town of Puerto Errado.

PUERTO ERRADO 2 has a capacity of 30 megawatts (MW), making it a medium-scale solar photovoltaic facility.

The plant is owned by TUBO SOL PE2 S.L., a Spanish company involved in solar energy development.

Spain's renewable energy sector is governed by the EU Renewable Energy Directive III, which sets a 42.5% renewable target by 2030. Spain also offers feed-in tariffs and streamlined grid connection for solar projects.

By generating 30 MW of solar power, PUERTO ERRADO 2 helps Spain reduce reliance on fossil fuels and meet its EU-mandated renewable energy targets.