Overview
Buri Ram 2 Solar Power Plant is a 7.4 MW solar PV facility in Thailand, owned by Solar Power (Bureerum 2) Company Limited and currently operational.
Buri Ram 2 Solar Power Plant is a solar photovoltaic facility located in Thailand, with a capacity of 7.4 MW. The plant is owned by Solar Power (Bureerum 2) Company Limited and is currently operational, contributing to the country's renewable energy generation. Thailand has set ambitious renewable energy targets under its Alternative Energy Development Plan (AEDP), aiming for 30% renewable energy by 2037. Solar PV plays a key role in this strategy, supported by feed-in tariffs and net metering schemes. The Buri Ram 2 plant operates within this regulatory framework, benefiting from policies that encourage solar deployment. The plant's location in Buri Ram province, a region with high solar irradiation, supports efficient energy generation. As a small-to-medium scale solar farm, it contributes to local grid stability and reduces reliance on fossil fuels. The facility supports Thailand's transition towards cleaner energy and helps meet growing electricity demand in the region.
Environmental context
Solar PV plants like Buri Ram 2 have minimal environmental impact during operation, with no emissions or water consumption. However, land use for solar arrays can affect local ecosystems and agriculture. In Thailand, solar farms are often sited on degraded land to minimize conflict. The plant's location in Buri Ram, a predominantly agricultural area, requires careful planning to avoid land-use competition. Grid integration of variable solar power also poses challenges for grid stability, managed through energy storage and demand response.
Frequently asked questions
Buri Ram 2 Solar Power Plant is located in Buri Ram province, Thailand, at coordinates 14.6996 N, 102.4787 E.
The plant has a capacity of 7.4 megawatts (MW), making it a small-to-medium scale solar PV facility.
The plant is owned by Solar Power (Bureerum 2) Company Limited.
Thailand's Alternative Energy Development Plan (AEDP) targets 30% renewable energy by 2037, supported by feed-in tariffs and net metering for solar PV.
The plant adds 7.4 MW of clean energy to the grid, reducing reliance on fossil fuels and supporting Thailand's renewable energy targets.