Overview
Khok Thai Solar Power Plant is a 12.7 MW solar PV facility in Thailand, operated by Ch. Karnchang Public Company Limited. It contributes to Thailand's renewable energy targets under the Alternative Energy Development Plan.
Khok Thai Solar Power Plant is a solar photovoltaic facility located in Thailand, with a capacity of 12.7 megawatts. The plant is owned and operated by Ch. Karnchang Public Company Limited, a major Thai construction and engineering firm. This facility is part of Thailand's growing solar energy sector, which supports the country's goal to increase renewable energy share under the Alternative Energy Development Plan (AEDP). The plant utilizes solar PV technology to convert sunlight into electricity, feeding into the national grid. With a capacity of 12.7 MW, it falls within the small-to-medium scale for solar farms in Thailand. The facility benefits from Thailand's feed-in tariff program and net metering policies that encourage distributed solar generation. Operationally, Khok Thai Solar Power Plant helps reduce reliance on fossil fuels and lowers greenhouse gas emissions. It supports local energy needs and contributes to Thailand's renewable energy targets, which aim for 30% renewable energy by 2037. The plant's location in Nakhon Ratchasima province benefits from high solar irradiation, making it suitable for solar power generation.
Environmental context
The plant is located in a region with high solar irradiation, typical for Thailand's northeastern plateau. Solar PV installations have low operational emissions but require land use; this facility likely occupies agricultural or undeveloped land. Proper siting minimizes ecological disruption, and solar farms can coexist with grazing or agriculture. The plant supports Thailand's goal to reduce carbon emissions and air pollution from fossil fuel power plants.
Frequently asked questions
Khok Thai Solar Power Plant is located in Thailand, specifically in Nakhon Ratchasima province (coordinates: 14.7635 N, 102.0694 E).
The plant has a capacity of 12.7 megawatts (MW), making it a small-to-medium scale solar PV facility.
The plant is owned by Ch. Karnchang Public Company Limited, a prominent Thai construction and engineering firm.
Thailand's Alternative Energy Development Plan (AEDP) targets 30% renewable energy by 2037, supported by feed-in tariffs and net metering policies for solar PV.
The plant generates clean electricity, reducing greenhouse gas emissions and air pollution compared to fossil fuel plants, supporting Thailand's climate goals.