Overview
30 Acres is a 4.965 MW solar PV facility in the United Kingdom, operated by Navitas Project. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.
30 Acres is a solar photovoltaic (PV) facility located in the United Kingdom, with an operational capacity of 4.965 megawatts. Developed by Navitas Project, the plant is part of the UK's growing solar energy sector, which benefits from government support mechanisms such as the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO) program. The facility uses standard solar PV technology to convert sunlight into electricity. While specific technical details like panel type or inverter model are not disclosed, the 4.965 MW capacity places it in the small-to-medium scale range for UK solar farms. The UK's solar sector has expanded rapidly, supported by declining costs and policy frameworks aimed at achieving net-zero emissions by 2050. Environmentally, 30 Acres contributes to reducing greenhouse gas emissions by displacing fossil fuel-based electricity generation. Solar PV has minimal operational emissions, though land use and visual impact are considerations. The facility supports the UK's target of 40 GW solar capacity by 2030, aligning with national climate goals.
Environmental context
Solar PV facilities like 30 Acres have a low environmental footprint during operation, with no direct emissions. However, land use for solar farms can affect local ecosystems and agriculture. In the UK, solar developments are often sited on lower-grade agricultural land or brownfield sites to minimize conflict. The facility's location in the East Midlands region benefits from moderate solar irradiance, typical for northern Europe.
Frequently asked questions
30 Acres is located in the United Kingdom, with coordinates approximately 53.2062° N, -1.1968° W. The exact address is not publicly listed, but it is situated in the East Midlands region.
The 30 Acres solar PV facility has a capacity of 4.965 megawatts (MW), making it a small-to-medium scale solar farm in the UK context.
The facility is owned by Navitas Project. Typically the owner or a third-party O&M contractor manages daily operations.
The UK supports solar energy through the Contracts for Difference (CfD) scheme, which provides stable revenue for low-carbon generation, and the Renewable Obligation (RO) for older projects. The UK aims for 40 GW solar capacity by 2030 under its Net Zero Strategy.
Solar PV generates electricity with zero operational emissions, reducing reliance on fossil fuels. It helps the UK meet carbon reduction targets and improves energy security, though land use and visual impacts are considered during planning.