Solar PV Operational

Berry Court Farm Solar PV Facility, United Kingdom

United Kingdom
Visit official website

Overview

Berry Court Farm is a 4.2 MW solar PV facility in the United Kingdom, operational under Green Switch Solutions. It contributes to the UK's renewable energy capacity.

Berry Court Farm is a solar photovoltaic (PV) facility located in the United Kingdom, with an installed capacity of 4.2 megawatts (MW). The plant is operational and was developed by Green Switch Solutions, now sold. It represents a medium-scale solar installation within the UK's growing renewable energy sector. The facility operates under the UK's regulatory framework, which includes the Contracts for Difference (CfD) scheme and the Renewables Obligation (RO), supporting the deployment of low-carbon electricity. Solar PV technology converts sunlight directly into electricity, and Berry Court Farm's capacity is typical for a ground-mounted solar farm in the region. Environmentally, the plant contributes to reducing greenhouse gas emissions by displacing fossil fuel-based generation. Its location in southern England benefits from relatively high solar irradiance. The facility supports the UK's target of achieving net-zero emissions by 2050 and helps diversify the energy mix.

Environmental context

The facility is situated in a rural area of southern England, where land use for solar farms can impact local ecosystems. Solar PV installations require significant land area, potentially affecting agricultural use and local biodiversity. However, they produce no emissions during operation and have a low water footprint. The UK's temperate climate provides moderate solar resource, but the plant still contributes to decarbonization.

Frequently asked questions

Berry Court Farm is a solar PV facility located in the United Kingdom, with coordinates approximately 51.328° N, -1.112° W.

Berry Court Farm has an installed capacity of 4.2 megawatts (MW), making it a medium-scale solar installation.

The facility was developed by Green Switch Solutions and has since been sold.

The UK supports solar PV through the Contracts for Difference (CfD) scheme and the Renewables Obligation (RO), which provide financial incentives for renewable electricity generation.

By generating clean electricity, Berry Court Farm helps reduce reliance on fossil fuels and supports the UK's goal of net-zero emissions by 2050.
UtilityRadar
More
Press Esc to close · Browse by sector