Solar PV Operational

Brickyard Barn (resubmission) Solar PV Facility, United Kingdom

United Kingdom
Visit official website

Overview

Brickyard Barn (resubmission) is a 4.1 MW solar PV facility in the United Kingdom, operated by Sun Glow Power. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.

Brickyard Barn (resubmission) is a solar photovoltaic (PV) facility located in the United Kingdom, with a capacity of 4.1 MW. The plant is owned and operated by Sun Glow Power and is currently operational, adding to the country's growing solar energy portfolio. The facility operates under the UK's regulatory framework for renewable energy, which includes the Contracts for Difference (CfD) scheme that provides stable revenue for low-carbon electricity generation. Solar PV is a key technology in the UK's transition to net-zero emissions, with capacity expanding rapidly in recent years. As a medium-scale solar installation, Brickyard Barn contributes to local grid stability and reduces reliance on fossil fuels. Solar farms in the UK typically have a lifespan of 25-30 years and require minimal water for operation, making them a low-impact renewable energy source.

Environmental context

Solar PV installations like Brickyard Barn have a low environmental footprint during operation, with no emissions or water consumption. However, land use for solar farms can affect local ecosystems and agricultural land. In the UK, solar developments are often sited on lower-grade agricultural land to minimize conflict with food production. The facility's location in the Midlands benefits from moderate solar irradiance, typical for the region.

Frequently asked questions

Brickyard Barn (resubmission) is a solar PV facility located in the United Kingdom, with coordinates approximately 52.2506° N, -1.5558° E.

The facility has a capacity of 4.1 MW, making it a medium-scale solar installation.

The facility is owned by Sun Glow Power.

Solar PV in the UK is supported by the Contracts for Difference (CfD) scheme, which provides price stability for low-carbon electricity, and the Renewable Obligation (RO) for older projects.

Solar PV helps the UK meet its target of net-zero emissions by 2050, with the government aiming for 70 GW of solar capacity by 2035.
UtilityRadar
More
Press Esc to close · Browse by sector