Solar PV Operational

Cadland 2 Solar PV Plant | United Kingdom Renewable Energy Facility

United Kingdom
Visit official website

Overview

Cadland 2 is a 3 MW solar PV facility in the United Kingdom, owned by Manor of Cadland. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.

Cadland 2 is a solar photovoltaic (PV) power plant located in the United Kingdom, owned by Manor of Cadland. With a capacity of 3.02 MW, it is a small-scale solar installation that feeds clean electricity into the national grid. The facility is operational and supports the UK's transition to low-carbon energy sources. The plant operates under the UK's regulatory framework for renewable energy, which includes the Contracts for Difference (CfD) scheme and the Renewables Obligation. These policies provide financial support for solar PV and other renewable technologies, helping to reduce carbon emissions and meet climate targets. Solar PV is a mature technology in the UK, with installations ranging from rooftop arrays to utility-scale farms. Cadland 2 contributes to local and national renewable energy goals by generating electricity without direct greenhouse gas emissions. It also helps diversify the UK's energy mix and reduce reliance on fossil fuels. The facility's location in southern England benefits from relatively high solar irradiance, supporting efficient energy production.

Environmental context

Solar PV installations like Cadland 2 have a low environmental footprint during operation, producing no air emissions or water consumption. However, they require land use and can impact local ecosystems through habitat alteration. In the UK, solar farms are often sited on agricultural land, balancing energy generation with food production. The panels are typically recyclable, and the site can be restored after decommissioning.

Frequently asked questions

Cadland 2 is located in the United Kingdom, near the village of Cadland in southern England. Its coordinates are approximately 50.81° N, 1.36° W.

Cadland 2 has a capacity of 3.02 megawatts (MW), making it a small-scale solar photovoltaic facility.

Cadland 2 is owned by Manor of Cadland, a private entity.

The UK supports solar PV through the Contracts for Difference (CfD) scheme and the Renewables Obligation, which provide financial incentives for renewable electricity generation.

Cadland 2 generates clean electricity, reducing reliance on fossil fuels and helping the UK meet its goal of net-zero emissions by 2050.
UtilityRadar
More
Press Esc to close · Browse by sector