Solar PV Operational

Ellough Solar Farm Phase Two - 4.99 MW Solar PV Facility in the United Kingdom

United Kingdom
Visit official website

Overview

Ellough Solar Farm Phase Two is a 4.99 MW solar PV facility in the United Kingdom, operated by Lark Energy. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.

Ellough Solar Farm Phase Two is a solar photovoltaic (PV) facility located in the United Kingdom, with a capacity of 4.99 MW. Developed and operated by Lark Energy, the plant is operational and contributes to the country's growing solar energy portfolio. The facility is situated in the East of England, a region with significant solar resource and supportive renewable energy policies. The UK's renewable energy sector operates under the Contracts for Difference (CfD) framework, which provides stable revenue for low-carbon electricity generation. Solar PV projects like Ellough Solar Farm Phase Two benefit from this scheme, which has driven substantial deployment of solar capacity across the country. The plant's capacity of 4.99 MW places it in the small-to-medium scale category, typical for ground-mounted solar farms in the UK. Environmentally, the facility generates clean electricity, reducing reliance on fossil fuels and contributing to the UK's net-zero emissions target by 2050. Solar farms have a low operational carbon footprint and can coexist with agricultural activities, though land-use considerations are important. The plant supports local grid stability and helps meet regional renewable energy targets.

Environmental context

The East of England region has favorable solar irradiation levels for PV generation. Solar farms like Ellough require land area for panel arrays, which can impact local land use and visual landscape. However, they produce no emissions during operation and have minimal water consumption. The UK's regulatory framework encourages solar development while managing environmental impacts through planning requirements.

Frequently asked questions

Ellough Solar Farm Phase Two is located in the United Kingdom, near the village of Ellough in Suffolk, East of England.

The facility has a capacity of 4.99 MW, making it a small-to-medium scale solar PV installation.

The facility is operated by Lark Energy, a UK-based renewable energy developer.

Solar PV in the UK is supported by the Contracts for Difference (CfD) scheme, which provides long-term price stability for low-carbon electricity generation.

By generating clean electricity, the facility helps reduce carbon emissions and supports the UK's goal of achieving net-zero emissions by 2050.
UtilityRadar
More
Press Esc to close · Browse by sector