Overview
Four Burrows Farm (Extension 2) is a 6.3 MW solar PV facility in the United Kingdom, owned by RES UK & Ireland Limited. It contributes to the country's renewable energy capacity under the UK's regulatory framework.
Four Burrows Farm (Extension 2) is a solar photovoltaic (PV) facility located in the United Kingdom, owned by RES UK & Ireland Limited. With a capacity of 6.3 MW, it represents a small- to medium-scale solar installation within the UK's renewable energy landscape. The facility operates under the UK's regulatory framework, which includes the Contracts for Difference (CfD) scheme and the Renewables Obligation (RO). Solar PV technology converts sunlight directly into electricity, and the UK has seen significant growth in solar capacity, supported by government incentives and declining costs. This extension adds to the existing Four Burrows Farm solar site, enhancing local renewable energy generation. The facility helps reduce greenhouse gas emissions and supports the UK's target of net-zero emissions by 2050. Its grid-connected operation contributes to the stability and decarbonization of the regional electricity supply.
Environmental context
Solar PV installations like Four Burrows Farm (Extension 2) have a low environmental footprint during operation, with no emissions or water use. However, land use for solar farms can impact local habitats and visual landscapes. In the UK, solar farms are often sited on agricultural land, requiring careful planning to minimize ecological disruption. The facility's location in Cornwall benefits from relatively high solar irradiance, supporting efficient energy generation.
Frequently asked questions
Four Burrows Farm (Extension 2) is located in the United Kingdom, near Truro in Cornwall. The facility is a solar PV installation owned by RES UK & Ireland Limited.
The facility has a capacity of 6.3 megawatts (MW), making it a small- to medium-scale solar farm. It generates electricity from solar photovoltaic panels.
The facility is owned by RES UK & Ireland Limited, a leading renewable energy company that develops, constructs, and operates wind, solar, and energy storage projects.
Solar PV in the UK is supported by the Contracts for Difference (CfD) scheme, which provides stable revenue for low-carbon electricity, and the Renewables Obligation (RO), which requires suppliers to source a proportion of electricity from renewables. The UK aims to achieve net-zero emissions by 2050.
Solar PV generates electricity without greenhouse gas emissions or air pollutants during operation. It reduces reliance on fossil fuels and helps mitigate climate change. However, land use and visual impacts are considerations that are addressed through planning and environmental assessments.