Solar PV Operational

Land At Debdale Lane Solar PV Facility, United Kingdom

United Kingdom
Visit official website

Overview

Land At Debdale Lane is a 5 MW solar PV facility in the United Kingdom, owned by Equitix Fund IV. It is operational and contributes to the UK's renewable energy capacity.

Land At Debdale Lane is a solar photovoltaic (PV) facility located in the United Kingdom, with a capacity of 5 MW. The plant is owned by Equitix Fund IV and is currently operational, adding to the country's growing portfolio of solar energy assets. The facility operates under the UK's regulatory framework for renewable energy, which includes the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO) program. Solar PV technology converts sunlight directly into electricity, and at 5 MW, this plant is considered a small-to-medium scale installation, typical for ground-mounted solar farms in the UK. The plant contributes to the UK's target of achieving net-zero emissions by 2050 by generating clean electricity. It also supports local grid stability and reduces reliance on fossil fuels. The environmental context includes land-use considerations typical for solar farms, such as dual-use potential for agriculture or biodiversity enhancement.

Environmental context

Solar PV installations like Land At Debdale Lane require land area for panel arrays, which can impact local land use. However, they produce no emissions during operation and have low water consumption. The UK's solar farms often incorporate biodiversity measures, such as wildflower planting, to support pollinators and local ecosystems.

Frequently asked questions

Land At Debdale Lane is a solar PV facility located in the United Kingdom, with coordinates approximately 53.1602° N, -1.2161° W.

The facility has a capacity of 5 megawatts (MW), making it a small-to-medium scale solar installation.

The facility is owned by Equitix Fund IV, a UK-based infrastructure investment fund.

The UK supports solar PV through the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO), which provide financial incentives for renewable electricity generation.

Solar PV generates electricity without greenhouse gas emissions, helping the UK meet its net-zero emissions target by 2050 and its interim goal of 40 GW solar capacity by 2030.
UtilityRadar
More
Press Esc to close · Browse by sector