Overview
Land North East Of Penrose Far is a 1.5 MW solar PV facility in the United Kingdom, operated by Clean Earth Energy. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.
Land North East Of Penrose Far is a solar photovoltaic (PV) facility located in the United Kingdom, with an operational capacity of 1.5 megawatts (MW). Developed by Clean Earth Energy, this small-scale solar installation supports the UK's transition to low-carbon electricity generation. The facility is situated in a region with moderate solar irradiance, typical for the UK's temperate climate. The UK's renewable energy sector operates under the Contracts for Difference (CfD) framework, which provides stable revenue for low-carbon generators. Solar PV installations like this one benefit from the UK's Renewable Obligation and CfD schemes, which have driven significant solar deployment. At 1.5 MW, this facility falls into the small-scale category, often connected to local distribution networks rather than the high-voltage transmission grid. This solar farm contributes to the UK's target of achieving net-zero emissions by 2050. By generating clean electricity, it reduces reliance on fossil fuels and helps lower carbon emissions in the local area. The facility's operational status ensures ongoing renewable energy production, supporting grid stability and the decarbonization of the UK's energy mix.
Environmental context
Solar PV installations like Land North East Of Penrose Far have a low environmental footprint during operation, producing no direct emissions. However, land use for solar farms can impact local habitats and agricultural land. In the UK, solar developments are subject to planning regulations that consider visual impact and biodiversity. The facility's location in a rural area may involve trade-offs between renewable energy generation and land conservation.
Frequently asked questions
Land North East Of Penrose Far is a solar PV facility located in the United Kingdom, near the coordinates 50.3767, -4.9570.
The facility has a capacity of 1.5 megawatts (MW), making it a small-scale solar installation.
The facility is owned by Clean Earth Energy, a renewable energy developer in the UK.
Solar PV in the UK is supported by the Contracts for Difference (CfD) scheme and the Renewable Obligation, which provide financial incentives for low-carbon electricity generation.
Solar PV helps the UK achieve its net-zero emissions target by 2050 by generating clean electricity, reducing reliance on fossil fuels, and lowering carbon emissions.