Overview
Land off Moss Land (resubmission) is a 5 MW solar PV facility in the United Kingdom, owned by Greencoat Capital. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.
Land off Moss Land (resubmission) is a solar photovoltaic (PV) facility located in the United Kingdom, with an installed capacity of 5 megawatts (MW). The facility is owned by Greencoat Capital, a major investor in renewable energy infrastructure. As a solar PV plant, it converts sunlight into electricity, feeding into the national grid. The facility operates under the UK's regulatory framework, which includes the Contracts for Difference (CfD) scheme that provides stable revenue for low-carbon electricity generation. The UK has a target of achieving net-zero emissions by 2050, and solar PV plays a key role in the country's renewable energy mix, alongside wind and biomass. The 5 MW scale places this facility in the small-to-medium category for solar farms in the UK. Solar PV facilities like Land off Moss Land contribute to reducing greenhouse gas emissions and diversifying the UK's energy supply. They also support local grid stability and can provide community benefits through shared ownership or local investment schemes. The facility's operational status ensures ongoing generation of clean electricity.
Environmental context
Solar PV installations require land use, which can impact local ecosystems and agricultural activities. However, they produce no emissions during operation and have a relatively low environmental footprint compared to fossil fuels. The UK's temperate climate with moderate solar irradiance means that solar farms are typically designed to maximize efficiency, often incorporating biodiversity measures such as wildflower meadows or sheep grazing.
Frequently asked questions
Land off Moss Land (resubmission) is a solar PV facility located in the United Kingdom, with coordinates approximately 53.8457° N, -2.7596° W.
The facility has an installed capacity of 5 megawatts (MW), making it a small-to-medium scale solar farm in the UK context.
The facility is owned by Greencoat Capital, a leading investor in renewable energy infrastructure in the UK and Europe.
Solar PV in the UK benefits from the Contracts for Difference (CfD) scheme, which provides guaranteed prices for low-carbon electricity. The UK also has a target of 40 GW of solar capacity by 2030 as part of its net-zero strategy.
Solar PV generates clean electricity without emissions, helping the UK reduce reliance on fossil fuels. The UK aims to achieve net-zero emissions by 2050, with solar playing a key role alongside wind and other renewables.