Overview
Land South West Of Apollo Business Park is a 1.7 MW solar PV facility in the United Kingdom, owned by Cyrasol Ecotec. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.
Land South West Of Apollo Business Park is a solar photovoltaic (PV) facility located in the United Kingdom, with a capacity of 1.7 megawatts (MW). Owned by Cyrasol Ecotec, the plant is operational and contributes to the country's growing solar energy portfolio. As a small-scale solar installation, it supports local energy generation and grid stability. The facility operates under the UK's regulatory framework for renewable energy, which includes the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO) program. These mechanisms provide financial support for low-carbon electricity generation, encouraging investment in solar PV and other renewables. The UK has a target of net-zero emissions by 2050, and solar power plays a key role in this transition. Solar PV installations like this one help reduce greenhouse gas emissions and dependence on fossil fuels. While the plant's capacity is modest, it contributes to the UK's renewable energy mix and supports local energy resilience. The facility's location in the English countryside aligns with typical solar farm siting, utilizing open land for clean energy production.
Environmental context
Solar PV installations in the UK are typically sited on agricultural or brownfield land, minimizing land-use conflicts. The environmental impact includes habitat alteration during construction, but operational benefits include zero emissions and reduced air pollution. Grid integration of solar power requires careful management due to intermittency, but the UK's grid infrastructure is adapting to higher renewable penetration.
Frequently asked questions
The facility is located in the United Kingdom, near the Apollo Business Park area. Exact coordinates are 52.0794° N, -1.4169° W.
It is a solar photovoltaic (PV) facility that generates electricity from sunlight, with a capacity of 1.7 MW.
The facility is owned by Cyrasol Ecotec, a company involved in renewable energy development.
The UK supports solar PV through the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO), which provide financial incentives for low-carbon electricity generation.
Solar PV helps the UK achieve its net-zero emissions target by 2050 by generating clean electricity, reducing reliance on fossil fuels, and diversifying the energy mix.