Overview
Liddeston Ridge Solar Park is a 5 MW solar PV facility in Milford Haven, United Kingdom, owned by Milford Haven Port Authority. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.
Liddeston Ridge Solar Park is a 5 MW solar photovoltaic facility located in Milford Haven, United Kingdom. Owned by Milford Haven Port Authority, the plant is operational and adds to the region's renewable energy generation. As a small-scale solar installation, it supports local energy needs and the UK's transition to low-carbon power. The facility operates under the UK's regulatory framework for renewable energy, which includes the Contracts for Difference (CfD) scheme that provides price stability for low-carbon generators. Solar PV technology converts sunlight directly into electricity, and at 5 MW, this plant is typical of small-to-medium solar farms in the UK, often situated on brownfield or agricultural land. By generating clean electricity, Liddeston Ridge Solar Park helps reduce greenhouse gas emissions and supports the UK's target of net-zero emissions by 2050. Its location in Pembrokeshire contributes to the local renewable energy mix, and the plant's output is fed into the national grid, aiding in grid decarbonization.
Environmental context
Solar PV installations like Liddeston Ridge Solar Park have a low environmental footprint during operation, with no emissions or water use. However, land use for solar farms can impact local ecosystems and visual landscapes. In the UK, solar farms are often sited on lower-grade agricultural land to minimize conflict with food production. The facility's location in Milford Haven, a port area with industrial history, may reduce land-use competition.
Frequently asked questions
Liddeston Ridge Solar Park is located in Milford Haven, Pembrokeshire, United Kingdom.
The solar park has a capacity of 5 megawatts (MW), making it a small-scale solar PV facility.
The facility is owned by Milford Haven Port Authority, a public trust port in Wales.
Solar PV in the UK is supported by the Contracts for Difference (CfD) scheme, which guarantees a fixed price for low-carbon electricity, and the Renewables Obligation (now closed to new entrants). The UK aims to reach 40 GW of solar capacity by 2030.
By generating electricity from sunlight, the solar park avoids carbon emissions that would come from fossil fuel generation, supporting the UK's net-zero emissions target.