Overview
Oulton Airfield Solar Farm (Phase 1) is a 5 MW solar PV facility in the United Kingdom, operational and owned by Solar Century/Bluefield Solar.
Oulton Airfield Solar Farm (Phase 1) is a solar photovoltaic facility located in the United Kingdom. With a capacity of 5 MW, it represents a small-to-medium scale solar installation contributing to the country's renewable energy portfolio. The facility is operational and owned by Solar Century/Bluefield Solar. The United Kingdom has a supportive regulatory framework for renewable energy, including the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO) for larger projects. Solar PV installations like this one benefit from these mechanisms, which provide revenue stability and encourage investment. The 5 MW scale is typical for ground-mounted solar farms in the UK, often developed on former airfields or agricultural land. Environmentally, the facility generates clean electricity, displacing fossil fuel generation and reducing greenhouse gas emissions. Solar farms have low operational emissions and can coexist with biodiversity measures such as wildflower planting. The site's location on a former airfield minimizes land-use conflict, as it repurposes previously developed land.
Environmental context
The facility is located on a former airfield, which reduces pressure on greenfield land and avoids agricultural displacement. Solar PV installations have minimal water use and no air emissions during operation. The UK's solar resource is moderate, but the technology remains effective at reducing carbon emissions compared to grid electricity.
Frequently asked questions
Oulton Airfield Solar Farm (Phase 1) is located in the United Kingdom, at coordinates 52.7975 N, 1.1839 E, on the site of a former airfield.
The facility has a capacity of 5 megawatts (MW), making it a small-to-medium scale solar photovoltaic installation.
The facility is owned by Solar Century/Bluefield Solar, a partnership between a solar developer and a investment fund focused on renewable energy.
The UK supports solar PV through the Contracts for Difference (CfD) scheme, which provides stable revenue for low-carbon electricity, and the Renewable Obligation (RO) for larger projects. Smaller installations may benefit from the Smart Export Guarantee (SEG).
Solar PV helps the UK meet its legally binding target of net-zero emissions by 2050 and interim goals under the Climate Change Act. It also supports the UK's commitment to increase renewable electricity generation, reducing reliance on fossil fuels.