Overview
Padleywood Farm is a 5 MW solar PV facility in the United Kingdom, operated by OST Energy. It contributes to the UK's renewable energy capacity under the Contracts for Difference (CfD) scheme.
Padleywood Farm is a solar photovoltaic (PV) facility located in the United Kingdom, with a capacity of 5 megawatts (MW). This scale places it within the small-to-medium range for solar farms in the UK, which typically range from 1 MW to 50 MW. The facility is owned and operated by OST Energy, a renewable energy developer active in the UK solar market. The UK solar sector operates under the Contracts for Difference (CfD) regime, which provides stable revenue for low-carbon electricity generation. Solar PV installations benefit from the UK's Renewable Obligation (RO) and Feed-in Tariff (FiT) schemes, though large-scale projects now primarily rely on CfDs. Padleywood Farm, being operational, contributes to the UK's target of net-zero emissions by 2050 and the interim goal of 40 GW solar capacity by 2030. Environmentally, solar farms like Padleywood Farm generate clean electricity with zero operational emissions. However, they require land use that may affect local ecosystems. The UK's planning framework requires biodiversity net gain assessments for such developments. The facility's location in the East Midlands region supports grid stability and reduces reliance on fossil fuels, aligning with national decarbonization goals.
Environmental context
Solar PV installations in the UK, such as Padleywood Farm, occupy land that could otherwise be used for agriculture or natural habitats. While they produce no direct emissions, their construction and operation can impact local biodiversity. The UK's planning policies often require measures to enhance wildlife corridors and protect bird species. The facility's 5 MW capacity contributes to reducing greenhouse gas emissions by displacing fossil fuel generation, supporting the UK's climate targets.
Frequently asked questions
Padleywood Farm is a solar PV facility located in the United Kingdom, with coordinates 53.1481° N, -1.3870° W, in the East Midlands region.
Padleywood Farm has a capacity of 5 megawatts (MW), making it a small-to-medium scale solar installation in the UK.
Padleywood Farm is owned and operated by OST Energy, a renewable energy company active in the UK solar market.
Solar PV in the UK is supported by the Contracts for Difference (CfD) scheme, the Renewable Obligation (RO), and Feed-in Tariffs (FiTs), with a target of 40 GW solar capacity by 2030.
Padleywood Farm generates zero-emission electricity, reducing reliance on fossil fuels and supporting the UK's net-zero emissions target by 2050.