Solar PV Operational

Parabel North Beer Solar Farm: 6.8 MW Solar PV Facility in the United Kingdom

United Kingdom
Visit official website

Overview

Parabel North Beer Solar Farm is a 6.8 MW operational solar PV facility in the United Kingdom, owned by 35 Degrees. It contributes to the UK's renewable energy capacity under the Contracts for Difference (CfD) scheme.

Parabel North Beer Solar Farm is a solar photovoltaic (PV) facility located in the United Kingdom, with an operational capacity of 6.8 MW. The plant is owned by 35 Degrees and is part of the country's growing solar energy portfolio, which supports the UK's target of net-zero emissions by 2050. The facility operates under the UK's regulatory framework, including the Contracts for Difference (CfD) scheme, which provides stable revenue for low-carbon electricity generation. Solar PV technology converts sunlight directly into electricity, and the 6.8 MW scale places it in the small-to-medium range for utility-scale solar farms in the UK. Solar farms like Parabel North Beer Solar Farm play a key role in diversifying the UK's energy mix and reducing reliance on fossil fuels. The electricity generated is fed into the national grid, contributing to local and national renewable energy targets while supporting grid stability.

Environmental context

Solar PV farms require significant land area, which can impact local land use and visual landscapes. In the UK, solar developments are often sited on agricultural land, balancing energy generation with food production. The environmental benefits include zero greenhouse gas emissions during operation and reduced air pollution compared to fossil fuel plants.

Frequently asked questions

Parabel North Beer Solar Farm is located in the United Kingdom, with coordinates approximately 50.7013° N, -4.4025° W.

The facility has a capacity of 6.8 MW, making it a small-to-medium scale solar PV installation.

The solar farm is owned by 35 Degrees, a renewable energy company.

Solar farms in the UK benefit from the Contracts for Difference (CfD) scheme, which guarantees a fixed price for electricity, and the Renewable Obligation (RO) for older projects. The UK aims to reach 70 GW of solar capacity by 2035.

Solar PV generates clean electricity without emissions, helping the UK meet its legally binding target of net-zero emissions by 2050 and its interim goal of 100% zero-carbon electricity by 2035.
UtilityRadar
More
Press Esc to close · Browse by sector