Overview
Redbridge Road is a 6.4 MW solar PV facility located in the United Kingdom. The plant is operational and contributes to the country's renewable energy capacity.
Redbridge Road is a solar photovoltaic (PV) facility located in the United Kingdom, with a capacity of 6.4 megawatts. This scale places it within the small-to-medium range for solar farms in the country. The plant is currently operational, generating clean electricity from solar energy. The facility operates under the United Kingdom's regulatory framework for renewable energy, which includes the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO) program. These mechanisms support the deployment of solar PV and other renewables, aligning with national targets to achieve net-zero emissions by 2050. The UK has seen significant growth in solar capacity, with over 14 GW installed as of 2023. Environmentally, Redbridge Road contributes to reducing greenhouse gas emissions and diversifying the UK's energy mix. Solar PV has a low operational carbon footprint and minimal water use. The facility's location in southern England benefits from favorable solar irradiation levels, supporting efficient energy generation. Its grid connection helps integrate renewable power into the local distribution network.
Environmental context
The facility is located in a region with moderate solar irradiation typical of southern England. Solar PV installations like this one have a low environmental impact during operation, with no emissions or water consumption. However, land use for solar farms can affect local habitats and agricultural land. Proper siting and biodiversity measures can mitigate these impacts. The UK's regulatory framework encourages such considerations through planning guidelines.
Frequently asked questions
Redbridge Road is a solar PV facility located in the United Kingdom, with coordinates approximately 50.694° N, -2.313° W.
The Redbridge Road solar plant has a capacity of 6.4 megawatts (MW), placing it in the small-to-medium scale for solar farms in the UK.
Yes, Redbridge Road is currently operational and generating electricity from solar energy.
The UK supports solar PV through the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO) program, which provide financial incentives for renewable energy generation.
Solar PV facilities produce electricity with zero operational emissions, reduce reliance on fossil fuels, and have low water usage. They contribute to the UK's net-zero emissions target.