Overview
Redlands Farm is a 6.2 MW solar PV facility in the United Kingdom, operated by juwi Renewable Energies. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.
Redlands Farm is a solar photovoltaic (PV) facility located in the United Kingdom, with a capacity of 6.2 megawatts. Developed and owned by juwi Renewable Energies, the plant is operational and feeds clean electricity into the national grid. This scale places it within the small-to-medium range for UK solar farms, which typically range from 5 MW to 50 MW. The facility operates under the UK's regulatory framework for renewable energy, which includes the Contracts for Difference (CfD) scheme that provides stable revenue for low-carbon electricity generation. Solar PV technology converts sunlight directly into electricity using semiconductor panels, with no moving parts and minimal maintenance. The UK's solar capacity has grown significantly, supported by government targets to achieve net-zero emissions by 2050. Redlands Farm contributes to local energy security and reduces reliance on fossil fuels. By generating renewable electricity, it helps lower greenhouse gas emissions and supports the UK's transition to a sustainable energy system. The facility's output is equivalent to powering approximately 1,800 homes annually, displacing thousands of tonnes of CO2 each year.
Environmental context
Solar PV installations like Redlands Farm have a low environmental footprint during operation, with no emissions or water use. However, land use for solar farms can impact local ecosystems and agriculture. In the UK, solar farms are often sited on low-grade agricultural land, balancing energy generation with food production. The panels may also affect local microclimates and biodiversity, though careful site selection and management can mitigate these impacts.
Frequently asked questions
Redlands Farm is a solar PV facility located in the United Kingdom, with coordinates approximately 51.1129° N, -2.8192° W.
Redlands Farm has a capacity of 6.2 megawatts (MW), making it a small-to-medium scale solar installation.
Redlands Farm is owned by juwi Renewable Energies, a global renewable energy company specializing in solar and wind projects.
Solar PV in the UK is supported by the Contracts for Difference (CfD) scheme, which guarantees a fixed price for low-carbon electricity, and the Renewable Obligation (RO) for older projects. The UK aims to reach 70 GW of solar capacity by 2035.
Solar PV generates electricity without greenhouse gas emissions or air pollutants, reducing reliance on fossil fuels. It also has low water consumption and can be deployed on rooftops or brownfield sites to minimize land-use impact.