Overview
Shelswell is a 5 MW solar PV facility in the United Kingdom, operated by Anesco. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.
Shelswell is a solar photovoltaic (PV) facility located in the United Kingdom, with an installed capacity of 5.06 MW. Developed and owned by Anesco, the plant is operational and feeds renewable electricity into the national grid. This scale places it among small-to-medium solar installations typical of the UK's distributed solar sector. The facility uses standard solar PV technology, converting sunlight directly into electricity. The UK's renewable energy framework, including the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO), supports such projects by providing price stability and incentives for low-carbon generation. Shelswell benefits from these mechanisms, which have driven significant solar deployment across the country. Environmentally, Shelswell displaces fossil-fuel-based electricity, reducing greenhouse gas emissions. Solar PV has minimal operational emissions, though land use and visual impact are considerations. The plant supports the UK's target of net-zero emissions by 2050 and aligns with the EU's Renewable Energy Directive III, which sets a 42.5% renewable target by 2030.
Environmental context
Solar PV facilities like Shelswell have low operational emissions but require land for panel arrays, which can affect local ecosystems and land use. In the UK, solar farms are often sited on agricultural land, balancing energy generation with food production. The plant's location in a temperate climate means moderate solar irradiance, but efficiency is maintained through modern panel technology. Grid integration is managed via the UK's robust transmission network.
Frequently asked questions
Shelswell is a solar PV facility located in the United Kingdom, with coordinates approximately 51.974 N, -1.116 W.
Shelswell has an installed capacity of 5.06 megawatts (MW), making it a small-to-medium scale solar installation.
Shelswell is owned by Anesco, a UK-based renewable energy company. Anesco typically manages its own assets.
Solar farms in the UK benefit from the Contracts for Difference (CfD) scheme and the Renewable Obligation (RO), which provide price guarantees and incentives for renewable generation.
Shelswell generates clean electricity, reducing reliance on fossil fuels and supporting the UK's goal of net-zero emissions by 2050, as well as the EU's 42.5% renewable target by 2030.