Overview
Upper Meadowley Farm is a 10.7 MW solar PV facility in the United Kingdom, operational and owned by GDL Upper Meadowley. It contributes to the UK's renewable energy capacity under the Contracts for Difference scheme.
Upper Meadowley Farm is a solar photovoltaic (PV) facility located in the United Kingdom, with an installed capacity of 10.7 megawatts. The plant is operational and owned by GDL Upper Meadowley, reflecting the growing trend of solar energy deployment in the UK's renewable energy landscape. The facility operates under the UK's regulatory framework, which includes the Contracts for Difference (CfD) scheme that provides stable revenue for low-carbon electricity generation. Solar PV technology converts sunlight directly into electricity, and at this scale, the plant can power approximately 3,000 typical UK homes annually, contributing to the country's target of net-zero emissions by 2050. Environmentally, the solar farm supports the UK's transition away from fossil fuels, reducing greenhouse gas emissions and air pollution. The site's location in a rural area minimizes land-use conflicts, and the facility is designed to integrate with the local grid, supporting energy security and decentralization.
Environmental context
The facility is situated in a rural area of the United Kingdom, where solar farms are increasingly common. The environmental context includes considerations of land use and visual impact, which are managed through planning regulations. Solar PV generation displaces fossil fuel electricity, reducing carbon emissions and supporting the UK's climate goals. The site's location avoids sensitive habitats, and the panels are typically mounted on ground-mounted frames that allow for agricultural activities or biodiversity enhancement underneath.
Frequently asked questions
Upper Meadowley Farm is a solar PV facility located in the United Kingdom, with coordinates approximately 52.5295° N, -2.4909° W.
The facility has an installed capacity of 10.7 megawatts (MW), making it a medium-scale solar installation.
The facility is owned by GDL Upper Meadowley, a company involved in renewable energy generation.
The UK supports solar PV through the Contracts for Difference (CfD) scheme, which provides guaranteed prices for low-carbon electricity, and the Renewable Obligation (now closed to new entrants). The UK aims for net-zero emissions by 2050.
Solar PV generates electricity without emitting greenhouse gases or air pollutants, reducing reliance on fossil fuels. It also supports energy independence and can be deployed on land that continues to serve agricultural or ecological purposes.