Overview
Worsted Farm is a 5 MW solar PV facility in the United Kingdom, operational and contributing to the nation's renewable energy capacity under the Contracts for Difference scheme.
Worsted Farm is a solar photovoltaic (PV) facility located in the United Kingdom, with an installed capacity of 5 megawatts (MW). The plant is operational and owned by S4N Worsted, playing a role in the country's transition to low-carbon electricity generation. As a solar PV installation, it converts sunlight directly into electricity, feeding into the national grid. The facility operates within the UK's supportive renewable energy framework, which includes the Contracts for Difference (CfD) scheme and the Renewables Obligation (RO). These mechanisms provide price stability and incentives for renewable generators. Solar PV is a mature technology in the UK, with capacity ranging from small rooftop systems to large utility-scale farms. At 5 MW, Worsted Farm falls into the small-to-medium scale category for solar farms in the country. Environmentally, Worsted Farm contributes to reducing greenhouse gas emissions by displacing fossil-fuel-based electricity. Solar PV has minimal operational emissions, though land use and visual impact are considerations. The facility supports the UK's target of achieving net-zero emissions by 2050 and aligns with the growing share of renewables in the national energy mix.
Environmental context
Solar PV facilities like Worsted Farm occupy land that could otherwise be used for agriculture or natural habitats. However, they produce no direct emissions during operation and have a low water footprint. The UK's temperate climate with moderate solar irradiance means that solar farms require larger areas compared to sunnier regions, but they still offer a clean energy source that reduces reliance on fossil fuels.
Frequently asked questions
Worsted Farm is a solar PV facility located in the United Kingdom, with coordinates approximately 51.1245° N, 0.0155° E.
Worsted Farm has an installed capacity of 5 megawatts (MW), making it a small-to-medium scale solar farm in the UK.
Worsted Farm is owned by S4N Worsted, a company involved in renewable energy generation.
Solar PV in the UK benefits from the Contracts for Difference (CfD) scheme and the Renewables Obligation (RO), which provide financial support and incentives for renewable electricity generation.
By generating clean electricity from solar energy, Worsted Farm helps reduce carbon emissions and supports the UK's goal of achieving net-zero emissions by 2050.