Overview
Coronus Adelanto West 1 is a 1.5 MW solar PV facility in Adelanto, California, owned by CF SBC Master Tenant One LLC. It contributes to the state's renewable energy portfolio under California's Renewable Portfolio Standard.
Coronus Adelanto West 1 is a solar photovoltaic (PV) facility located in Adelanto, California, United States. With a capacity of 1.5 MW, it is a small-scale solar installation that feeds renewable electricity into the local grid. The facility is owned by CF SBC Master Tenant One LLC and is currently operational. The plant utilizes solar PV technology, converting sunlight directly into electricity. California's Renewable Portfolio Standard (RPS) requires 60% renewable energy by 2030 and 100% by 2045, creating a favorable regulatory environment for solar projects. The facility benefits from the federal Investment Tax Credit (ITC) under the Inflation Reduction Act (IRA), which supports solar deployment. As a distributed solar installation, Coronus Adelanto West 1 helps reduce greenhouse gas emissions and supports grid stability in the Mojave Desert region. Its modest scale minimizes land-use impacts while contributing to California's clean energy transition. The facility's operational status ensures ongoing generation of carbon-free electricity.
Environmental context
The facility is located in the Mojave Desert region, characterized by high solar irradiance, making it ideal for solar PV generation. The area's arid climate and open land minimize shading and maximize energy output. However, large-scale solar installations can impact desert ecosystems and wildlife habitats. The 1.5 MW scale of this plant reduces such environmental footprint compared to utility-scale projects.
Frequently asked questions
Coronus Adelanto West 1 is located in Adelanto, California, United States, in the Mojave Desert region.
The facility has a capacity of 1.5 megawatts (MW), making it a small-scale solar PV installation.
The facility is owned by CF SBC Master Tenant One LLC.
California's Renewable Portfolio Standard (RPS) mandates 60% renewable energy by 2030 and 100% by 2045, supported by the federal Investment Tax Credit (ITC) under the Inflation Reduction Act.
The facility generates carbon-free electricity, reducing greenhouse gas emissions and supporting California's clean energy goals.