Overview
BAYOU CONCRETE - FOLEY PLANT is a stormwater outfall in Foley, Alabama, USA. It manages stormwater discharge from an industrial catchment under the US EPA NPDES MS4 program.
BAYOU CONCRETE - FOLEY PLANT is a stormwater outfall located at 9138 County Road 65 in Foley, Baldwin County, Alabama. It operates within the regulatory framework of the US Clean Water Act and the EPA's NPDES MS4 permit system, which governs stormwater discharges from industrial facilities. The plant serves an industrial catchment associated with concrete manufacturing (NAICS 327320), managing runoff from the site to prevent pollution of local waterways. As a stormwater outfall, the facility is subject to NPDES permit requirements that mandate best management practices (BMPs) for controlling pollutants in runoff. Typical BMPs include sediment basins, vegetative swales, and regular inspection. The plant's discharge likely flows into nearby water bodies, potentially affecting water quality in the region. Compliance with permit conditions is critical to avoid environmental penalties. The facility plays a key role in managing stormwater impacts from industrial operations in Foley, Alabama. By controlling runoff, it helps protect local water resources from sedimentation and other pollutants. The plant's location in a coastal area underscores the importance of stormwater management in preventing flooding and maintaining water quality in sensitive ecosystems.
Environmental context
The plant is located in Baldwin County, Alabama, a coastal region with a humid subtropical climate and frequent heavy rainfall events. Stormwater runoff from industrial sites can carry pollutants such as sediment, heavy metals, and chemicals into local waterways, potentially impacting water quality in Mobile Bay and the Gulf of Mexico. The facility operates under NPDES MS4 regulations to mitigate these risks through appropriate stormwater controls.
Frequently asked questions
BAYOU CONCRETE - FOLEY PLANT is located at 9138 County Road 65 in Foley, Baldwin County, Alabama, USA.
It is a stormwater outfall that manages runoff from an industrial concrete manufacturing facility, ensuring compliance with NPDES MS4 permit requirements.
The facility operates under NAICS code 327320, which covers ready-mix concrete manufacturing.
Stormwater outfalls in the US are regulated under the Clean Water Act through the EPA's NPDES MS4 program, which requires permits for discharges from industrial and municipal sources.
The facility implements best management practices to control pollutants in stormwater runoff, helping to protect local waterways and the Gulf of Mexico ecosystem.
Other Stormwater Outfall plants in United States · 6 nearby