Risk: Medium Stormwater Outfall Operational

ESTES CARLOWVILLE PIT Stormwater Outfall, Minter, Alabama | Industrial Runoff Management

MINTER, Alabama, United States

Overview

ESTES CARLOWVILLE PIT is a stormwater outfall in Minter, Alabama, serving an industrial catchment. It operates under US EPA NPDES MS4 regulations for stormwater discharge.

ESTES CARLOWVILLE PIT is a stormwater outfall located at 351 County Road 4 in Minter, Dallas County, Alabama. The facility manages stormwater runoff from an industrial catchment area, with NAICS codes 212321 (Construction Sand and Gravel Mining) and 212325 (Clay and Ceramic and Refractory Minerals Mining) indicating mining-related activities. As a stormwater outfall, it discharges collected runoff into local waterways. The facility operates under the US EPA National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) program, which regulates stormwater discharges to protect water quality. In Alabama, the Alabama Department of Environmental Management (ADEM) administers the NPDES program. The outfall likely requires a permit that specifies monitoring and best management practices to control pollutants. Stormwater outfalls like ESTES CARLOWVILLE PIT play a critical role in managing runoff from industrial sites, reducing the risk of flooding and preventing pollutants from entering water bodies. The facility's location in a rural area of Alabama with mining operations means it must comply with regulations to minimize impacts on local streams and the Alabama River watershed.

Environmental context

The facility is located in Dallas County, Alabama, within the Alabama River watershed. The region experiences a humid subtropical climate with heavy rainfall, increasing the risk of stormwater runoff carrying sediments and pollutants from mining operations. Discharge from the outfall could affect local water quality, particularly if the receiving water body is impaired. Regulatory oversight under the Clean Water Act requires the facility to implement erosion and sediment controls to protect aquatic habitats.

Frequently asked questions

ESTES CARLOWVILLE PIT is located at 351 County Road 4 in Minter, Dallas County, Alabama, United States.

It is a stormwater outfall that collects and discharges stormwater runoff from an industrial catchment area, primarily associated with mining operations (sand, gravel, clay, and ceramics).

The facility operates under the US EPA NPDES MS4 program, which requires permits for stormwater discharges from industrial activities. In Alabama, ADEM oversees compliance with the Clean Water Act.

A stormwater outfall is a point where collected stormwater runoff is discharged into a water body, such as a stream or river. It is part of a municipal separate storm sewer system (MS4) designed to manage runoff and prevent flooding.

Stormwater management controls the quantity and quality of runoff, reducing erosion, flooding, and pollution. Best management practices (BMPs) like sediment basins and vegetative buffers help protect water quality and aquatic ecosystems.

Other Stormwater Outfall plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector