Overview
FORMER SHOP-A-SNAK #28 (PANTRY 3823) is a stormwater outfall in Tuscaloosa, Alabama, USA. It manages runoff from a commercial site under the EPA NPDES MS4 permit framework.
FORMER SHOP-A-SNAK #28 (PANTRY 3823) is a stormwater outfall located at 724 Skyland Boulevard in Tuscaloosa, Alabama, United States. This facility manages stormwater runoff from a former convenience store site, classified under NAICS 447110 (gasoline stations with convenience stores). As a stormwater outfall, it discharges collected runoff into the local drainage system, serving a small commercial catchment. The facility operates under the regulatory framework of the US EPA's National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) permits. Tuscaloosa is subject to Phase II MS4 requirements, which mandate stormwater management programs for small municipalities. The outfall likely includes basic treatment measures such as sediment control and oil-water separation to manage pollutants from the parking lot and fueling area. This outfall contributes to local flood control and water quality protection in the Black Warrior River watershed. Its location in a commercial area means runoff may contain hydrocarbons, heavy metals, and sediment. Proper operation helps reduce pollutant loads to receiving waters, supporting community and environmental health in Tuscaloosa.
Environmental context
The outfall discharges into the Black Warrior River watershed, which supports diverse aquatic life and provides drinking water for the region. Urban runoff from commercial areas like Skyland Boulevard can carry pollutants such as oil, grease, and sediment. The facility's stormwater management helps mitigate impacts on water quality, particularly given the area's clay soils and periodic heavy rainfall events common in Alabama.
Frequently asked questions
The stormwater outfall is located at 724 Skyland Boulevard in Tuscaloosa, Alabama, USA.
It manages stormwater runoff from a former convenience store site, discharging collected water into the local drainage system to prevent flooding and reduce pollutant loads.
The outfall operates under the US EPA NPDES MS4 program, specifically Phase II requirements for small municipalities like Tuscaloosa, which mandate stormwater management plans.
Common pollutants include oil and grease from parking lots, heavy metals, sediment, and nutrients from fertilizers. Treatment measures like oil-water separators help mitigate these.
It helps protect the Black Warrior River watershed by controlling runoff quality and quantity, reducing erosion and pollution from urban areas.
Other Stormwater Outfall plants in United States · 6 nearby