Risk: Medium Stormwater Outfall Operational

READY MIX USA, LLC-AUBURN FACILITY Stormwater Outfall, Auburn, Alabama

AUBURN, Alabama, United States

Overview

READY MIX USA, LLC-AUBURN FACILITY is a stormwater outfall in Auburn, Alabama, serving the ready-mix concrete industry under EPA NPDES MS4 regulations.

READY MIX USA, LLC-AUBURN FACILITY is a stormwater outfall located at 120 Lee County Road 870 in Auburn, Alabama, United States. The facility operates within the ready-mix concrete manufacturing sector (NAICS 327320) and is subject to stormwater discharge regulations under the Clean Water Act. As a stormwater outfall associated with industrial activity, this facility is likely covered by an EPA NPDES Multi-Sector General Permit (MSGP) for stormwater discharges. The permit requires implementation of best management practices (BMPs) to control pollutants in runoff from the concrete plant, including sediment, pH, and concrete washout. The facility's location in Lee County places it under the jurisdiction of the Alabama Department of Environmental Management (ADEM) for state-level stormwater permitting. Stormwater outfalls from concrete manufacturing facilities can impact local water quality if not properly managed. The facility's discharge may flow to nearby waterbodies in the Tallapoosa River basin. Compliance with NPDES permit conditions, including regular monitoring and reporting, is essential to minimize environmental impact and protect downstream uses.

Environmental context

The facility is located in Auburn, Alabama, within the Piedmont region, where stormwater runoff can carry sediment and pollutants to local streams. The ready-mix concrete industry generates alkaline runoff and suspended solids that can affect aquatic life if untreated. The facility's discharge likely enters a municipal separate storm sewer system (MS4) or directly to a waterbody, requiring adherence to EPA's effluent guidelines for construction and industrial activity.

Frequently asked questions

The facility is located at 120 Lee County Road 870, Auburn, Alabama 36830, United States.

It is a stormwater outfall associated with a ready-mix concrete manufacturing plant (NAICS 327320), subject to NPDES stormwater regulations.

The facility operates under the EPA's National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit (MSGP) for industrial stormwater discharges, administered by the Alabama Department of Environmental Management.

Common pollutants include sediment, concrete washout with high pH, suspended solids, and trace metals. Best management practices such as sediment basins and pH adjustment are required.

Stormwater discharges from the facility can impact nearby streams in the Tallapoosa River basin if not properly managed. Compliance with NPDES permit limits helps protect aquatic ecosystems.

Other Stormwater Outfall plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector