Overview
SHELLEY PIT is an operational stormwater outfall in Headland, Alabama, serving the Henry County area. It manages stormwater runoff from local catchments to mitigate flooding and protect water quality.
SHELLEY PIT is a stormwater outfall located in Headland, Alabama, within Henry County. As a stormwater outfall, it functions as a discharge point for collected stormwater runoff, helping to manage urban and industrial drainage in the region. The facility is operational and serves the local community by conveying stormwater to receiving water bodies. The facility operates under the regulatory framework of the US EPA National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) permits. In Alabama, the Alabama Department of Environmental Management (ADEM) administers these permits, which require stormwater management plans to control pollution from runoff. The NAICS code 212399 indicates the facility may be associated with nonmetallic mineral mining, suggesting the pit could be a former quarry repurposed for stormwater detention. SHELLEY PIT plays a role in reducing flood risk and preventing untreated runoff from directly entering local waterways. By capturing and slowly releasing stormwater, it helps protect downstream ecosystems and water quality in the Chattahoochee River watershed. Proper management of this outfall is essential for compliance with Clean Water Act requirements and for safeguarding community and environmental health.
Environmental context
The facility is located in the Chattahoochee River basin, which supports diverse aquatic habitats and provides drinking water for downstream communities. Stormwater runoff from urban and industrial areas in Headland can carry pollutants such as sediment, nutrients, and heavy metals. Effective management at SHELLEY PIT helps reduce the impact of these pollutants on receiving waters, supporting local water quality goals and ecosystem health.
Frequently asked questions
SHELLEY PIT is located on County Road 85, off County Road 8, in Headland, Henry County, Alabama, United States.
SHELLEY PIT is a stormwater outfall that discharges collected stormwater runoff from the surrounding area into receiving waters, helping to manage flooding and control pollution.
Stormwater outfalls in Alabama are regulated under the US EPA NPDES MS4 program, administered by the Alabama Department of Environmental Management (ADEM). Operators must obtain permits and implement stormwater management plans to reduce pollutant discharges.
By capturing and controlling stormwater runoff, SHELLEY PIT helps reduce the transport of pollutants such as sediment and chemicals into local waterways, supporting the health of the Chattahoochee River watershed.
The NAICS code 212399 indicates the facility may be associated with nonmetallic mineral mining and quarrying, suggesting SHELLEY PIT could be a former quarry repurposed for stormwater detention and management.
Other Stormwater Outfall plants in United States · 6 nearby