Stormwater Outfall Operational

TLC/TELCO Stormwater Outfall, El Dorado, Arkansas | Industrial Runoff Management

EL DORADO, Arkansas, United States

Overview

TLC/TELCO is a stormwater outfall in El Dorado, Arkansas, serving industrial facilities including sawmills and timber operations. It operates under EPA NPDES MS4 regulations.

TLC/TELCO is a stormwater outfall located at 950 Del-Tin Hwy in El Dorado, Arkansas, within Union County. The facility serves industrial sectors including sawmills and wood product manufacturing, as indicated by its NAICS codes. As a stormwater outfall, it manages runoff from industrial activities, ensuring compliance with the Clean Water Act. The facility operates under the EPA's National Pollutant Discharge Elimination System (NPDES) program, which regulates stormwater discharges from industrial sites. In Arkansas, the Arkansas Department of Energy and Environment - Division of Environmental Quality (DEQ) administers the NPDES program. Industrial stormwater outfalls like TLC/TELCO are subject to monitoring and best management practices to control pollutants. Stormwater management at this site is critical for protecting local water quality in the Ouachita River basin. The facility's location in a timber and manufacturing region means runoff may contain sediment, organic matter, and other industrial byproducts. Proper operation helps prevent impairment of downstream water bodies and supports community and ecological health.

Environmental context

El Dorado is situated in the Ouachita River watershed, which supports diverse aquatic ecosystems. Industrial stormwater discharges from facilities like TLC/TELCO can carry pollutants such as sediment, nutrients, and metals. The region's clay soils and rolling terrain increase runoff potential. Regulatory oversight under the Clean Water Act aims to minimize these impacts through permit conditions and monitoring.

Frequently asked questions

TLC/TELCO is located at 950 Del-Tin Hwy in El Dorado, Arkansas, United States, in Union County.

TLC/TELCO is a stormwater outfall that manages industrial runoff from sawmills and wood product manufacturing facilities.

The facility operates under the EPA's NPDES program for industrial stormwater discharges, enforced by the Arkansas Department of Energy and Environment.

Industrial stormwater can carry pollutants like sediment, chemicals, and debris. Proper management prevents contamination of local waterways and protects aquatic ecosystems.

By complying with NPDES permit requirements, TLC/TELCO helps control runoff from timber and manufacturing operations, reducing impacts on the Ouachita River watershed.

Other Stormwater Outfall plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector