Risk: Medium Stormwater Outfall Operational

TRIPLE W CONSTRUCTION TOP SOIL PIT Stormwater Outfall, Attalla, Alabama

ATTALLA, Alabama, United States

Overview

TRIPLE W CONSTRUCTION TOP SOIL PIT is a stormwater outfall in Attalla, Alabama, United States. It operates under EPA NPDES MS4 regulations for stormwater discharge management.

TRIPLE W CONSTRUCTION TOP SOIL PIT is a stormwater outfall located in Attalla, Etowah County, Alabama, United States. The facility manages stormwater runoff from a construction top soil pit operation, classified under NAICS 212399 (Other Nonmetallic Mineral Mining and Quarrying). As a stormwater outfall, it discharges collected stormwater into local waterways, subject to federal and state regulations. The facility operates under the U.S. EPA National Pollutant Discharge Elimination System (NPDES) permitting framework, specifically the Construction General Permit (CGP) or Multi-Sector General Permit (MSGP) for industrial activities. Stormwater outfalls in Alabama are regulated by the Alabama Department of Environmental Management (ADEM) to ensure compliance with the Clean Water Act. Typical management practices include erosion and sediment controls, such as silt fences and sediment basins, to minimize pollutant discharge. The environmental significance of this outfall lies in its role in managing stormwater from a mining-related site, which can generate sediment and other pollutants. Proper operation helps protect downstream water quality in the Coosa River basin. The facility's location in a mixed urban-industrial area underscores the importance of stormwater controls to prevent impairment of local water bodies.

Environmental context

The facility is located in Attalla, Alabama, within the Coosa River watershed. Stormwater runoff from construction and mining activities can carry sediment, heavy metals, and other pollutants into nearby streams. The region experiences a humid subtropical climate with frequent heavy rainfall, increasing the risk of erosion and runoff. Effective stormwater management is critical to protect aquatic habitats and drinking water sources downstream.

Frequently asked questions

TRIPLE W CONSTRUCTION TOP SOIL PIT is located on Littleton Road, 0.25 miles from Highway 431, in Attalla, Etowah County, Alabama, United States.

It is a stormwater outfall that discharges collected stormwater from a top soil pit construction operation into local waterways, managed under an NPDES permit.

The facility is subject to the U.S. Clean Water Act and EPA NPDES regulations, including the Construction General Permit or Multi-Sector General Permit for industrial stormwater discharges.

The facility operates under NAICS code 212399, which covers other nonmetallic mineral mining and quarrying activities.

Proper stormwater management at this outfall reduces sediment and pollutant loads to the Coosa River watershed, protecting water quality and aquatic habitats in the region.

Other Stormwater Outfall plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector