Risk: Medium Operations Center Operational

APG SOLAR C/O BP SOLAR Operations Center, Atwater, California | Utility Operations

ATWATER, California, United States

Overview

APG SOLAR C/O BP SOLAR is an operations center in Atwater, California, managing solar energy assets. It operates under US regulatory frameworks for critical infrastructure protection.

APG SOLAR C/O BP SOLAR is an operations center located in Atwater, Merced County, California. As a facility within the Utility Operations sector, it oversees solar energy generation assets, contributing to the regional power grid. The facility is classified under NAICS code 221118 for Other Electric Power Generation. The facility operates under the regulatory oversight of the North American Electric Reliability Corporation (NERC) and adheres to Critical Infrastructure Protection (CIP) standards. These standards ensure cybersecurity and operational resilience for grid-connected assets. In California, additional state-level regulations from the California Public Utilities Commission (CPUC) may apply, focusing on renewable energy integration and grid reliability. As an operations center for solar power, this facility plays a key role in managing renewable energy output, which supports California's ambitious clean energy goals. Its location in the Central Valley provides high solar irradiance, making it an effective site for solar generation. The facility's operational status ensures continued contribution to the local and regional energy supply.

Environmental context

The facility is situated in the Central Valley of California, a region with high solar potential and significant agricultural activity. Its role as a solar operations center supports the transition to renewable energy, reducing greenhouse gas emissions compared to fossil fuel generation. The facility's cybersecurity and redundancy measures, aligned with NERC CIP standards, help ensure reliable grid operations despite environmental challenges such as drought or heatwaves.

Frequently asked questions

APG SOLAR C/O BP SOLAR is located at 2750 North Spaceport Entry, Atwater, California 95301, in Merced County.

It is an operations center that manages solar energy generation assets, overseeing their performance and integration into the power grid.

The facility operates under NERC CIP standards for critical infrastructure protection, ensuring cybersecurity and operational reliability for grid-connected assets.

By managing solar generation, it supports California's renewable portfolio standard, which aims for 100% clean electricity by 2045.

The NAICS code is 221118, which covers Other Electric Power Generation, including solar operations centers.

Other Operations Center plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector