Overview
Bloom Energy Apple NC is an operations center in Newton, North Carolina, supporting utility operations. It is part of the U.S. critical infrastructure sector, regulated under NERC CIP standards.
Bloom Energy Apple NC is an operations center located at 2161 Elbow Road, Newton, North Carolina, within Catawba County. As a facility in the United States, it operates within the framework of NERC CIP (Critical Infrastructure Protection) standards, which mandate cybersecurity and reliability measures for grid operators. The facility's NAICS code 221118 indicates it is involved in electric power distribution, suggesting a role in managing regional energy infrastructure. The operations center likely oversees local or regional utility operations, coordinating grid stability and power distribution. In the U.S., such facilities are subject to rigorous regulatory oversight to ensure resilience against physical and cyber threats. The scale of operations is typical for a single-site facility supporting a localized area, with redundancy and failover capabilities aligned with industry best practices. Environmental and operational significance includes its contribution to reliable electricity supply in the Newton area. As part of the broader U.S. grid, the facility supports community energy needs and economic activity. Its location in North Carolina places it within a region with growing energy demand, emphasizing the importance of robust utility operations for public safety and commerce.
Environmental context
The facility operates in a region with moderate climate risks, including hurricanes and winter storms, which can impact grid reliability. As an operations center, its cybersecurity maturity and redundancy capacity are critical for maintaining service continuity. The U.S. regulatory environment under NERC CIP ensures adherence to standards for critical infrastructure protection, mitigating risks from both natural and human-induced threats.
Frequently asked questions
Bloom Energy Apple NC is located at 2161 Elbow Road, Newton, North Carolina, in Catawba County, United States.
Bloom Energy Apple NC is an operations center involved in electric power distribution, supporting utility operations and grid management in the Newton area.
As a U.S. utility operations facility, it operates under NERC CIP (Critical Infrastructure Protection) standards, which mandate cybersecurity and reliability measures for grid operators.
The NAICS code for Bloom Energy Apple NC is 221118, which corresponds to Other Electric Power Generation, including electric power distribution.
The operations center coordinates local power distribution and grid stability, with redundancy and failover capabilities to maintain service during disruptions, in compliance with NERC CIP standards.
Other Operations Center plants in United States · 6 nearby