1 plants indexed.
HAM SUR HEURE wastewater treatment plant serves Beignée, Belgium, with secondary treatment. It has a design capacity of 8,900 m³/day and serves a population of 1,861.
UtilityRadar indexes 1 wastewater treatment plant in Beignée, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, HAM SUR HEURE has the highest designed capacity at 8,900 m3/day.