5 plants indexed. Showing 2 matching current filters.
ETE COMUNIDADE Fe EM DEUS is a wastewater treatment plant serving 28,140 people in Belém, Pará, Brazil. It operates within Brazil's national regulatory framework for sanitation.
ETE IPASEP is a wastewater treatment plant in Belém, Pará, Brazil, serving approximately 23,611 people. It is located within 50 km of the Atlantic coast, discharging into the Amazon River delta.
UtilityRadar indexes 5 wastewater treatment plants in Belém, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is COSANPA. UtilityRadar's records show 2 plants linked to this operator.
Among the indexed plants, ETE COMUNIDADE Fe EM DEUS has the highest designed capacity at 1 m3/day.