3 plants indexed.
ETE Laranjeiras Castilho is a secondary treatment plant serving 3,460 people in Castilho, São Paulo, Brazil. It discharges 432.00 cubic meters of treated wastewater daily.
ETE BAIRRO 17 is a wastewater treatment plant serving Castilho, São Paulo, Brazil. It serves a population of approximately 13,823 and operates under Brazil's national water quality regulations.
ETE V PLANALTO is a wastewater treatment plant serving Castilho, São Paulo, Brazil. It treats wastewater for approximately 23,484 people in the southeastern region.
UtilityRadar indexes 3 wastewater treatment plants in Castilho, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is SABESP. UtilityRadar's records show 3 plants linked to this operator.
Among the indexed plants, ETE BAIRRO 17 has the highest designed capacity at 1 m3/day.