3 plants indexed. Showing 2 matching current filters.
ETE SEDE 1 is a municipal wastewater treatment plant serving Fernandópolis, São Paulo, Brazil. It has a designed capacity of 1.00 and serves a population of 32,446.
ETE SEDE 2 serves Fernandópolis, São Paulo, Brazil, treating wastewater for approximately 30,747 residents. The plant is located inland, over 50 km from the coast, and discharges into local water bodies.
UtilityRadar indexes 3 wastewater treatment plants in Fernandópolis, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is SABESP. UtilityRadar's records show 2 plants linked to this operator.
Among the indexed plants, ETE SEDE 1 has the highest designed capacity at 1 m3/day.