Wastewater plants in Brazil

2,820 plants indexed. Showing 373 matching current filters.

373 plants matching filters

ETE PEDRO AVELINO

Pedro Avelino, Rio Grande do Norte

ETE PEDRO AVELINO is a secondary wastewater treatment plant in Pedro Avelino, Rio Grande do Norte, Brazil. It serves a population of 441 and discharges approximately 40.54 cubic meters of treated effluent.

Secondary 441 Low

ETE MARECHAL DUTRA

Mossoró, Rio Grande do Norte

ETE Marechal Dutra is a secondary wastewater treatment plant in Mossoró, Rio Grande do Norte, Brazil. It serves approximately 4,870 people and discharges 560 m³/day of treated effluent.

Secondary 4,870 Low

ETE LAGOA DAS MALVINAS

Mossoró, Rio Grande do Norte

ETE LAGOA DAS MALVINAS is a secondary treatment plant serving 6,262 people in Mossoró, Rio Grande do Norte, Brazil. Contributing to local water quality management.

Secondary 6,262 Low

ETE ESPIRITO SANTO

Espírito Santo, Rio Grande do Norte

ETE Espirito Santo is an advanced wastewater treatment plant serving 5,000 people in Espirito Santo, Rio Grande do Norte, Brazil. It discharges 414.01 m³/day of treated effluent, contributing to local water quality.

Advanced 5,000 Low

ETE CARNAUBAIS

Carnaubais, Rio Grande do Norte

ETE Carnaubais is a secondary wastewater treatment plant serving 2,855 people in Carnaubais, Rio Grande do Norte, Brazil. It discharges 210.61 cubic meters of treated effluent daily.

Secondary 2,855 Low

ETE ALTO DO RODRIGUES

Alto do Rodrigues, Rio Grande do Norte

ETE ALTO DO RODRIGUES is a secondary treatment plant serving 807 people in Alto do Rodrigues, Rio Grande do Norte, Brazil. It discharges 64.05 cubic meters of treated wastewater daily.

Secondary 807 Low

ETE AFONSO BEZERRA

Afonso Bezerra, Rio Grande do Norte

ETE Afonso Bezerra is a secondary wastewater treatment plant in Afonso Bezerra, Rio Grande do Norte, Brazil, serving a population of 635. It discharges approximately 50.32 cubic meters of treated effluent.

Secondary 635 Low

ETE VILA MARCELA

Petrolina, Pernambuco

ETE VILA MARCELA is a secondary treatment plant serving 1,989 people in Petrolina, Pernambuco, Brazil. It discharges 604.80 m³/day of treated wastewater, contributing to local water management in the São Francisco River basin.

Secondary 1,989 Low

ETE 04

Moreno, Pernambuco

ETE 04 is a secondary wastewater treatment plant in Moreno, Pernambuco, Brazil, serving 1,056 people. It discharges 304.13 cubic meters of treated wastewater daily, contributing to local water quality management.

Secondary 1,056 Low

ETE 05

Moreno, Pernambuco

ETE 05 is a secondary treatment plant serving 534 people in Moreno, Pernambuco, Brazil. It discharges 153.79 m³/day of treated wastewater into local water bodies.

Secondary 534 Low

ETE MULTIFABRIL

Jaboatão dos Guararapes, Pernambuco

ETE MULTIFABRIL is a secondary treatment plant serving 364 people in Jaboatão dos Guararapes, Pernambuco, Brazil. It discharges 414.00 m³/day of treated wastewater.

Secondary 364 Low

ETE SAPe

Sapé, Paraíba

ETE SAPe is a secondary wastewater treatment plant serving Sapé, Paraíba, Brazil. It treats wastewater for approximately 7,597 people and discharges 489.23 cubic meters of treated effluent daily.

Secondary 7,597 Low

ETE PEDRAS DE FOGO

Pedras de Fogo, Paraíba

ETE Pedras de Fogo is a secondary-level wastewater treatment plant serving the city of Pedras de Fogo, Paraiba, Brazil. It treats municipal wastewater for a population of approximately 1,969 people.

Secondary 1,969 Low

ETE MAMANGUAPE

Mamanguape, Paraíba

ETE Mamanguape is a secondary treatment plant serving 1,363 people in Mamanguape, Paraíba, Brazil. It discharges approximately 124.95 cubic meters of treated wastewater, supporting local water quality in the Mamanguape River basin.

Secondary 1,363 Low

ETE BARREIRINHAS

Barreirinhas, Maranhão

ETE Barreirinhas is a secondary treatment plant serving 1,943 people in Barreirinhas, Maranhão, Brazil. It discharges 216 m³/day of treated wastewater into local waterways.

Secondary 1,943 Low

ETE VILA DE FURNAS

Minaçu, Goiás

ETE VILA DE FURNAS is a secondary treatment plant serving 2,305 people in Minaçu, Goiás, Brazil. It discharges 373.39 m³/day of treated wastewater into the local watershed.

Secondary 2,305 Low

ETE MARA ROSA

Mara Rosa, Goiás

ETE MARA ROSA is a secondary-level wastewater treatment plant serving Mara Rosa, Goiás, Brazil. It treats municipal wastewater for approximately 5,552 residents with a discharge volume of 791.42 units.

Secondary 5,552 Low

ETE VICUNHA EFLUENTE INDUSTRIAL

Unknown, Ceará

ETE Vicunha Efluente Industrial is a secondary treatment plant in Pacajus, Ceará, Brazil, serving about 2,552 people. It discharges 217.46 m³/day of treated wastewater into local water bodies.

Secondary 2,552 Low

ETE PEDRO CAMARA

Maranguape, Ceará

ETE PEDRO CAMARA is a secondary treatment plant serving Maranguape, Ceará, Brazil. It discharges treated wastewater into local water bodies, supporting sanitation for approximately 2,346 residents.

Secondary 2,346 Low

ETE ALTO DO BILIAS

Maranguape, Ceará

ETE ALTO DO BILIAS is a secondary wastewater treatment plant in Maranguape, Ceará, Brazil. It serves a population of 2,346 and discharges 195.38 cubic meters of treated effluent.

Secondary 2,346 Low

Frequently asked

How many wastewater treatment plants are in Brazil?

UtilityRadar indexes 2820 wastewater treatment plants in Brazil, with treatment level, capacity, operator and discharge data on each record.

Who operates wastewater treatment in Brazil?

Among the plants on this page, the most-referenced operator is CAERN. UtilityRadar's records show 7 plants linked to this operator.

UtilityRadar
More
Press Esc to close · Browse by sector