2,820 plants indexed. Showing 952 matching current filters.
ETE Bocaina serves 10,900 people in Bocaina, São Paulo, Brazil. The plant operates under Brazil's national wastewater regulations, discharging treated effluent into local water bodies that drain into the Paraná River basin.
ETE Boa Esperanca do Sul serves approximately 12,118 people in Boa Esperança do Sul, São Paulo, Brazil. The plant operates under Brazil's national wastewater regulations for medium-sized agglomerations.
ETE BIRITIBA MIRIM serves approximately 8,400 residents in Biritiba Mirim, São Paulo, Brazil. The plant operates under Brazil's national wastewater regulations, contributing to local sanitation infrastructure.
ETE Vista Linda (ETE 2) is a wastewater treatment plant in Bertioga, São Paulo, Brazil, serving approximately 6,150 people. It operates under Brazil's national water quality regulations.
ETE Sul Bernardino de Campos serves the municipality of Bernardino de Campos in São Paulo, Brazil. The plant treats wastewater for approximately 6,350 residents, operating under Brazil's national environmental regulations.
ETE Mandembo is a wastewater treatment plant serving Bebedouro, São Paulo, Brazil. It handles a population of approximately 23,596 and discharges into local water bodies.
ETE Candeia serves approximately 35,000 residents in Bauru, São Paulo, Brazil. The plant operates under Brazil's national wastewater regulations for medium-sized agglomerations.
ETE Batatais is a municipal wastewater treatment plant serving approximately 49,000 people in Batatais, São Paulo, Brazil. It operates under Brazil's national water quality regulations.
ETE Barueri is a municipal wastewater treatment plant serving approximately 51,800 people in Barueri, São Paulo, Brazil. It operates under Brazil's national water quality regulations.
ETE Barrinha serves the city of Barrinha in São Paulo, Brazil, with a population of approximately 28,660. The plant operates under Brazil's national wastewater regulations, which mandate treatment for urban agglomerations.
ETE 3 BURACAO is a wastewater treatment plant serving Barretos, São Paulo, Brazil. It treats wastewater for approximately 55,988 people, supporting the region's sanitation infrastructure.
ETE 4 Estrada da Vendinha is a municipal wastewater treatment plant serving Barretos, São Paulo, Brazil. It treats wastewater for approximately 12,850 residents.
ETE 2 DAMA serves Barretos, São Paulo, Brazil, treating wastewater for approximately 12,850 people. The plant operates under Brazil's national water quality regulations.
ETE 1 BARRETOS 2 is a municipal wastewater treatment plant serving approximately 21,800 people in Barretos, São Paulo, Brazil. It operates under Brazil's national water quality regulations.
ETE BARIRI is a municipal wastewater treatment plant serving Bariri, São Paulo, Brazil. It has a designed capacity of 1.00 unit and serves a population of approximately 29,376.
ETE BALSAMO is a wastewater treatment plant serving Bálsamo, São Paulo, Brazil. It serves a population of 7,783 and has a designed capacity of 1.00 (unit unspecified).
ETE Bady Bassitt is a municipal wastewater treatment plant serving approximately 14,741 people in Bady Bassitt, São Paulo, Brazil. It operates under Brazil's national water quality regulations.
ETE Avaré serves Avaré, São Paulo, Brazil, treating wastewater for approximately 76,593 people. The plant operates under Brazil's national water quality regulations.
ETE Estoril Atibaia is a municipal wastewater treatment plant serving approximately 45,000 people in Atibaia, São Paulo, Brazil. It operates under Brazil's national water quality regulations.
ETE ARUJA is a municipal wastewater treatment plant serving Arujá, São Paulo, Brazil. It treats wastewater from approximately 41,245 people and discharges into the local watershed.
UtilityRadar indexes 2820 wastewater treatment plants in Brazil, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is SABESP. UtilityRadar's records show 20 plants linked to this operator.
Among the indexed plants, ETE BIRITIBA MIRIM has the highest designed capacity at 1 m3/day.