Wastewater plants in Brazil

2,820 plants indexed. Showing 1,603 matching current filters.

1,603 plants matching filters

ETE BIOSSISTEMA NOGUEIRA

Itaipava, Rio de Janeiro

ETE Biossistema Nogueira is a secondary treatment plant serving 736 people in Itaipava, Rio de Janeiro, Brazil. It discharges 172.80 cubic meters of treated wastewater daily.

Secondary 736 Low

ETE GRANJA BRASIL

Itaipava, Rio de Janeiro

ETE GRANJA BRASIL is a secondary treatment plant serving Itaipava, Petrópolis, Rio de Janeiro, Brazil. It treats wastewater for approximately 3,310 people and discharges 777.60 m³/day.

Secondary 3,310 Low

ETE FOSSA FILTRO ROSEIRAL

Cascatinha, Rio de Janeiro

ETE FOSSA FILTRO ROSEIRAL is a secondary treatment plant in Cascatinha, Petrópolis, Brazil, serving 368 people. It discharges 86.40 m³/day of treated wastewater into local water bodies.

Secondary 368 Low

ETE FOSSA FILTRO COCADA

Cascatinha, Rio de Janeiro

ETE FOSSA FILTRO COCADA is a secondary wastewater treatment plant in Cascatinha, Petrópolis, Rio de Janeiro, Brazil, serving 368 people with a discharge volume of 86.40 m³/day.

Secondary 368 Low

ETE UNIMED

Petrópolis, Rio de Janeiro

ETE UNIMED is a secondary wastewater treatment plant in Petrópolis, Rio de Janeiro, Brazil. It serves a small population of 368 and discharges 86.40 m³/day of treated effluent.

Secondary 368 Low

ETE TERMINAL RODOVIARIO

Petrópolis, Rio de Janeiro

ETE Terminal Rodoviario is a secondary treatment plant serving 736 people in Petrópolis, Rio de Janeiro, Brazil. It discharges 172.80 m³/day of treated wastewater into the local watershed.

Secondary 736 Low

ETE CENTRO PARACAMBI

Paracambi, Rio de Janeiro

ETE Centro Paracambi is a secondary treatment plant serving 717 people in Paracambi, Rio de Janeiro, Brazil. It discharges 94.14 thousand cubic meters of treated wastewater annually.

Secondary 717 Low

ETE SARAPUI

Belford Roxo, Rio de Janeiro

ETE SARAPUI is a secondary wastewater treatment plant in Belford Roxo, Rio de Janeiro, Brazil. It serves a small population and discharges treated effluent near the coast.

Secondary 142 Medium

ETE MARICA

Maricá, Rio de Janeiro

ETE MARICA is a secondary wastewater treatment plant in Maricá, Rio de Janeiro, Brazil, serving a population of 2,304. It discharges 276.48 m³/day of treated effluent near the coast.

Secondary 2,304 Medium

ETE MACAe

Macaé, Rio de Janeiro

ETE Macaé is a secondary treatment plant in Macaé, Rio de Janeiro, Brazil, serving 4,241 people. It discharges 520.23 m³/day of treated wastewater and is located within 10 km of the coast.

Secondary 4,241 Medium

ETE ITALVA

Italva, Rio de Janeiro

ETE ITALVA is a secondary wastewater treatment plant serving Italva, Rio de Janeiro, Brazil. It treats wastewater for approximately 2,513 people with a discharge volume of 452.30 cubic meters.

Secondary 2,513 Low

ETE NOVO HORIzONTE ITABORAI

Itaboraí, Rio de Janeiro

ETE Novo Horizonte Itaboraí is a secondary treatment plant serving 4,823 people in Itaboraí, Rio de Janeiro, Brazil. It discharges 694.07 m³/day of treated wastewater, contributing to local water quality management.

Secondary 4,823 Low

ETE GRANDE RIO II

Itaboraí, Rio de Janeiro

ETE GRANDE RIO II is a secondary wastewater treatment plant serving Itaboraí, Rio de Janeiro, Brazil. It treats municipal wastewater for a population of 4,823 and discharges 694.07 cubic meters per day.

Secondary 4,823 Low

ETE GRANDE RIO I

Itaboraí, Rio de Janeiro

ETE GRANDE RIO I is a secondary treatment plant serving Itaboraí, Rio de Janeiro, Brazil. It treats wastewater for approximately 4,823 people, discharging 694.07 m³/day into the local watershed.

Secondary 4,823 Low

ETE MANIBRA

Barra do Piraí, Rio de Janeiro

ETE MANIBRA is a secondary wastewater treatment plant in Barra do Piraí, Rio de Janeiro, Brazil, serving approximately 7,816 people with a discharge volume of 906.70 units.

Secondary 7,816 Low

ETE CALIFoRNIA BARRA DO PIRAI

Barra do Piraí, Rio de Janeiro

ETE California Barra do Piraí is a secondary treatment plant serving about 7,800 people in Barra do Piraí, Rio de Janeiro, Brazil. It discharges approximately 907 m³/day of treated wastewater.

Secondary 7,816 Low

ETE MONTE ALTO

Arraial do Cabo, Rio de Janeiro

ETE MONTE ALTO is a secondary wastewater treatment plant in Arraial do Cabo, Rio de Janeiro, Brazil, serving approximately 8,064 people. It discharges treated effluent near the coast, supporting local water quality.

Secondary 8,064 Medium

ETE MORRO DOS MORENOS

Mambucaba, Rio de Janeiro

ETE Morro dos Morenos is a secondary treatment plant serving 1,213 people in Mambucaba, Angra dos Reis, Rio de Janeiro, Brazil. It discharges 184.03 m³/day of treated wastewater near the coast.

Secondary 1,213 Medium

ETE NORTE OLHO DAGUA

Wenceslau Braz, Paraná

ETE NORTE OLHO DAGUA is a secondary wastewater treatment plant in Wenceslau Braz, Paraná, Brazil, serving a population of 591. It discharges 86.40 cubic meters of treated wastewater daily.

Secondary 591 Low

ETE SUL MATADOURO

Wenceslau Braz, Paraná

ETE SUL MATADOURO is a secondary treatment plant in Wenceslau Braz, Paraná, Brazil, serving approximately 3,500 people. It discharges 511.49 cubic meters of treated wastewater daily.

Secondary 3,501 Low

Frequently asked

How many wastewater treatment plants are in Brazil?

UtilityRadar indexes 2820 wastewater treatment plants in Brazil, with treatment level, capacity, operator and discharge data on each record.

Who operates wastewater treatment in Brazil?

Among the plants on this page, the most-referenced operator is CEDAE. UtilityRadar's records show 18 plants linked to this operator.

UtilityRadar
More
Press Esc to close · Browse by sector